Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 2 de 2
Filtrar
Mais filtros

Base de dados
Ano de publicação
Tipo de documento
País de afiliação
Intervalo de ano de publicação
1.
Ergonomics ; 52(12): 1584-9, 2009 Dec.
Artigo em Inglês | MEDLINE | ID: mdl-19941190

RESUMO

In the construction sector, overhead drilling into concrete or metal ceilings is a strenuous task associated with shoulder, neck and back musculoskeletal disorders due to the large applied forces and awkward arm postures. Two intervention devices, an inverted drill press and a foot lever design, were developed then compared to the usual method by construction workers performing their normal overhead drilling activities (n = 14). While the intervention devices were rated as less fatiguing than the usual method, their ratings on usability measures were worse than the usual method. The study demonstrates that the intervention devices can reduce fatigue; however, additional modifications are necessary in order to improve usability and productivity. Devices designed to improve workplace safety may need to undergo several rounds of field testing and modification prior to implementation.


Assuntos
Dor nas Costas/prevenção & controle , Dor nas Costas/fisiopatologia , Materiais de Construção , Transtornos Traumáticos Cumulativos/prevenção & controle , Transtornos Traumáticos Cumulativos/fisiopatologia , Desenho de Equipamento , Ergonomia , Cervicalgia/prevenção & controle , Cervicalgia/fisiopatologia , Doenças Profissionais/prevenção & controle , Doenças Profissionais/fisiopatologia , Postura , Dor de Ombro/prevenção & controle , Dor de Ombro/fisiopatologia , Suporte de Carga/fisiologia , Adulto , Feminino , Humanos , Masculino , Sistemas Homem-Máquina , Pessoa de Meia-Idade , Vibração/efeitos adversos
2.
Prof Saf ; 52(11): 30-35, 2007 Nov.
Artigo em Inglês | MEDLINE | ID: mdl-19079737

RESUMO

Drilling overhead into concrete is a strenuous task that is associated with shoulder, arm, neck and back musculoskeletal disorders due to the forceful and awkward aspects of the work. This common task is done to hang pipes, ducts and trays and is performed by construction workers in the electrical, pipe fitting, sheet metal, ironwork and carpentry trades. In this project, alternative devices for overhead drilling were developed in order to reduce the high shoulder loads. The design premise for the alternative devices was adopted from interventions developed on construction sites. These devices were evaluated for usability, productivity, and fatigue in two rounds of testing by 30 construction workers performing their usual overhead drilling. After each round of testing the device designs were modified based on feedback. The final design was associated with much less arm fatigue but similar productivity compared to the usual method for overhead drilling. The feedback, design suggestions and field testing by experienced construction workers was vital to the successful development of these devices. Field testing were done with real tasks, in diverse field settings, with subjects familiar with the task. Multiple rounds of field testing and redesign can significantly improve the safety and usability of new tools. Having experienced workers accessing the new tools can help with determining if and how a new tool is compatible and beneficial to current work practices.

SELEÇÃO DE REFERÊNCIAS
DETALHE DA PESQUISA