Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 2 de 2
Filtrar
Mais filtros

Base de dados
Ano de publicação
Tipo de documento
País de afiliação
Intervalo de ano de publicação
1.
J Healthc Qual ; 32(6): 18-26, 2010.
Artigo em Inglês | MEDLINE | ID: mdl-20946422

RESUMO

Surgeons have been slow to incorporate industrial reliability techniques. Process control methods were applied to surgeon waiting time between cases, and to length of stay (LOS) after colon surgery. Waiting times between surgeries were evaluated by auditing the operating room records of a single hospital over a 1-month period. The medical records of 628 patients undergoing colon surgery over a 5-year period were reviewed. The average surgeon wait time between cases was 53 min, and the busiest surgeon spent 291/2 hr in 1 month waiting between surgeries. Process control charting demonstrated poor overall control of the room turnover process. Average LOS after colon resection also demonstrated very poor control. Mean LOS was 10 days. Weibull's conditional analysis revealed a conditional LOS of 9.83 days. Serious process management problems were identified in both analyses. These process issues are both expensive and adversely affect the quality of service offered by the institution. Process control mechanisms were suggested or implemented to improve these surgical processes. Industrial reliability and quality management tools can easily and effectively identify process control problems that occur on surgical services.


Assuntos
Benchmarking/métodos , Procedimentos Cirúrgicos Operatórios/normas , Benchmarking/estatística & dados numéricos , Interpretação Estatística de Dados , Eficiência Organizacional , Humanos , Tempo de Internação , Garantia da Qualidade dos Cuidados de Saúde
SELEÇÃO DE REFERÊNCIAS
DETALHE DA PESQUISA