Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 11 de 11
Filtrar
Más filtros












Base de datos
Intervalo de año de publicación
1.
Rev Sci Instrum ; 91(1): 013320, 2020 Jan 01.
Artículo en Inglés | MEDLINE | ID: mdl-32012541

RESUMEN

The GTS-LHC ECR ion source (named after the Grenoble Test Source and the Large Hadron Collider) at CERN provides heavy ion beams for the chain of accelerators from Linac3 up to the LHC for high energy collision experiments and to the Super Proton Synchrotron for fixed target experiments. During the standard operation, the oven technique is used to evaporate lead into the source plasma to produce multiple charged lead ion beams. Intensity and stability are key parameters for the beam, and the operational experience is that some of the source instabilities can be linked to the oven performance. Over long operation periods of several weeks, the evaporation is not stable which makes the tuning of the oven unpredictable and nonreproducible. A dedicated test stand is used to study the oven performance and possible improvements independently of the source operation. It was observed that the measured evaporation rate of the oven can vary spontaneously in a wide range even when stable operating conditions are applied to the oven controls. Data collected at the test stand hint that these fluctuations are caused by temperature instabilities of the oven itself. Several ways to improve the oven stability were tested, including insulation changes and modifications of the oven crucible. Some of the most promising results regarding the stability of the evaporation will be presented in this paper.

2.
Rev Sci Instrum ; 89(12): 123301, 2018 Dec.
Artículo en Inglés | MEDLINE | ID: mdl-30599601

RESUMEN

At CERN, large hadron collider heavy ion and super proton synchrotron fixed target experiments are performed thanks to the Heavy-ion Facility, composed of different accelerators. The starting point is Linac3, which delivers 4.2 MeV/u ion beams to the low energy ion ring. In 2017, Linac3 accelerated Xe instead of the most usual Pb. This article summarizes the measurements performed during the machine development time allocated to characterize the line from the source to the filtering section. A parallel effort was devoted to matching those measurements to the beam dynamics simulations, and the second part of the article highlights the results achieved in this regard. Thanks to the improved understanding of the machine critical areas, a list of possible improvements is proposed at the end.

3.
Rev Sci Instrum ; 87(2): 02B912, 2016 Feb.
Artículo en Inglés | MEDLINE | ID: mdl-26932084

RESUMEN

Linac3 is the first accelerator in the heavy ion injector chain of the Large Hadron Collider (LHC), providing multiply charged heavy ion beams for the CERN experimental program. The ion beams are produced with GTS-LHC, a 14.5 GHz electron cyclotron resonance ion source, operated in afterglow mode. Improvement of the GTS-LHC beam formation and beam transport along Linac3 is part of the upgrade program of the injector chain in preparation for the future high luminosity LHC. A mismatch between the ion beam properties in the ion source extraction region and the acceptance of the following Low Energy Beam Transport (LEBT) section has been identified as one of the factors limiting the Linac3 performance. The installation of a new focusing element, an einzel lens, into the GTS-LHC extraction region is foreseen as a part of the Linac3 upgrade, as well as a redesign of the first section of the LEBT. Details of the upgrade and results of a beam dynamics study of the extraction region and LEBT modifications will be presented.

4.
Rev Sci Instrum ; 87(2): 02B923, 2016 Feb.
Artículo en Inglés | MEDLINE | ID: mdl-26932095

RESUMEN

The 14.5 GHz GTS-LHC Electron Cyclotron Resonance Ion Source (ECRIS) provides multiply charged heavy ion beams for the CERN experimental program. The GTS-LHC beam formation has been studied extensively with lead, argon, and xenon beams with varied beam extraction conditions using the ion optical code IBSimu. The simulation model predicts self-consistently the formation of triangular and hollow beam structures which are often associated with ECRIS ion beams, as well as beam loss patterns which match the observed beam induced markings in the extraction region. These studies provide a better understanding of the properties of the extracted beams and a way to diagnose the extraction system performance and limitations, which is otherwise challenging due to the lack of direct diagnostics in this region and the limited availability of the ion source for development work.

5.
Rev Sci Instrum ; 85(2): 02A954, 2014 Feb.
Artículo en Inglés | MEDLINE | ID: mdl-24593533

RESUMEN

The fixed target experiment NA61 in the North Area of the Super Proton Synchrotron is studying phase transitions in strongly interacting matter. Up to now they used the primary beams available from the CERN accelerator complex (protons and lead ions) or fragmented beams created from the primary lead ion beam. To explore a wider range of energies and densities a request was made to provide primary argon and xenon beams. This paper describes the results of the setting up and 10 week test run of the Ar(11+) beam from the 14.5 GHz ECR ion source and the linear accelerator (Linac3) at CERN.

6.
Rev Sci Instrum ; 81(2): 02A708, 2010 Feb.
Artículo en Inglés | MEDLINE | ID: mdl-20192378

RESUMEN

As part of the CERN accelerator complex upgrade, a new linear accelerator for H(-) (Linac4) will start its operation in 2014. The source for this linac will be a 2 MHz rf driven H(-) source which is a copy of the very successful source from DESY. In this paper the design and the first results of the commissioning are reported. The commissioning has progressed successfully, and no major obstacles have been identified which will prevent reaching the goal of 80 mA H(-) beam current, 45 keV beam energy, 0.4 ms pulse length, and 2 Hz repetition rate. The source is producing up until now a stable beam of 23 mA, 35 keV, and with a repetition rate of 0.83 Hz.

7.
Rev Sci Instrum ; 81(2): 02A722, 2010 Feb.
Artículo en Inglés | MEDLINE | ID: mdl-20192391

RESUMEN

The temperature distribution and heat flow at equilibrium of the plasma generator of the rf-powered noncesiated Linac4 H(-) ion source have been studied with a finite element model. It is shown that the equilibrium temperatures obtained in the Linac4 nominal operation mode (100 kW rf power, 2 Hz repetition rate, and 0.4 ms pulse duration) are within material specifications except for the magnet cage, where a redesign may be necessary. To assess the upgrade of the Linac4 source for operation in the high-power operation mode of the Superconducting Proton Linac (SPL), an extrapolation of the heat load toward 100 kW rf power, 50 Hz repetition rate, and 0.4 ms pulse duration has been performed. The results indicate that a significant improvement of the source cooling is required to allow for operation in the high-power mode of SPL.

8.
Rev Sci Instrum ; 81(2): 02A723, 2010 Feb.
Artículo en Inglés | MEDLINE | ID: mdl-20192392

RESUMEN

CERN's Linac4 is a 160 MeV linear accelerator currently under construction. It will inject negatively charged hydrogen ions into CERN's PS-Booster. Its ion source is a noncesiated rf driven H(-) volume source directly inspired from the one of DESY and is aimed to deliver pulses of 80 mA of H(-) during 0.4 ms at a 2 Hz repetition rate. The Superconducting Proton Linac (SPL) project is part of the luminosity upgrade of the Large Hadron Collider. It consists of an extension of Linac4 up to 5 GeV and is foreseen to deliver protons to a future 50 GeV synchrotron (PS2). For the SPL high power option (HP-SPL), the ion source would deliver pulses of 80 mA of H(-) during 1.2 ms and operate at a 50 Hz repetition rate. This significant upgrade motivates the design of the new water cooled plasma generator presented in this paper. Its engineering is based on the results of a finite element thermal study of the Linac4 H(-) plasma generator that identified critical components and thermal barriers. A cooling system is proposed which achieves the required heat dissipation and maintains the original functionality. Materials with higher thermal conductivity are selected and, wherever possible, thermal barriers resulting from low pressure contacts are removed by brazing metals on insulators. The AlN plasma chamber cooling circuit is inspired from the approach chosen for the cesiated high duty factor rf H(-) source operating at SNS.

9.
Rev Sci Instrum ; 79(2 Pt 2): 02A326, 2008 Feb.
Artículo en Inglés | MEDLINE | ID: mdl-18315116

RESUMEN

Intense heavy ion beam production with electron cyclotron resonance (ECR) ion sources is a common requirement for many of the accelerators under construction in Europe and elsewhere. An average increase of about one order of magnitude per decade in the performance of ECR ion sources was obtained up to now since the time of pioneering experiment of R. Geller at CEA, Grenoble, and this trend is not deemed to get the saturation at least in the next decade, according to the increased availability of powerful magnets and microwave generators. Electron density above 10(13) cm(-3) and very high current of multiply charged ions are expected with the use of 28 GHz microwave heating and of an adequate plasma trap, with a B-minimum shape, according to the high B mode concept [S. Gammino and G. Ciavola, Plasma Sources Sci. Technol. 5, 19 (1996)]. The MS-ECRIS ion source has been designed following this concept and its construction is underway at GSI, Darmstadt. The project is the result of the cooperation of nine European institutions with the partial funding of EU through the sixth Framework Programme. The contribution of different institutions has permitted to build in 2006-2007 each component at high level of expertise. The description of the major components will be given in the following with a view on the planning of the assembly and commissioning phase to be carried out in fall 2007. An outline of the experiments to be done with the MS-ECRIS source in the next two years will be presented.

10.
Rev Sci Instrum ; 79(2 Pt 2): 02A504, 2008 Feb.
Artículo en Inglés | MEDLINE | ID: mdl-18315125

RESUMEN

Future requirements on higher beam intensity and brightness will need an upgrade of the present CERN accelerator chain. Linac4 will be an essential part of the upgrade of the proton accelerator facility. The source for this H(-) linac will be based on a copy of the DESY rf driven H(-) source. New possible radio frequency quadrupole alternatives (with different injection energies) and a pressing linac schedule made it necessary to develop a flexible two-source design.

SELECCIÓN DE REFERENCIAS
DETALLE DE LA BÚSQUEDA
...