Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 2 de 2
Filtrar
Mais filtros












Base de dados
Intervalo de ano de publicação
1.
J Environ Qual ; 38(1): 111-20, 2009.
Artigo em Inglês | MEDLINE | ID: mdl-19141800

RESUMO

Lake Allatoona is a large reservoir north of Atlanta, GA, that drains an area of about 2870 km2 scheduled for a phosphorus (P) total maximum daily load (TMDL). The Soil and Water Assessment Tool (SWAT) model has been widely used for watershed-scale modeling of P, but there is little guidance on how to estimate P-related parameters, especially those related to in-stream P processes. In this paper, methods are demonstrated to individually estimate SWAT soil-related P parameters and to collectively estimate P parameters related to stream processes. Stream related parameters were obtained using the nutrient uptake length concept. In a manner similar to experiments conducted by stream ecologists, a small point source is simulated in a headwater sub-basin of the SWAT models, then the in-stream parameter values are adjusted collectively to get an uptake length of P similar to the values measured in the streams in the region. After adjusting the in-stream parameters, the P uptake length estimated in the simulations ranged from 53 to 149 km compared to uptake lengths measured by ecologists in the region of 11 to 85 km. Once the a priori P-related parameter set was developed, the SWAT models of main tributaries to Lake Allatoona were calibrated for daily transport. Models using SWAT P parameters derived from the methods in this paper outperformed models using default parameter values when predicting total P (TP) concentrations in streams during storm events and TP annual loads to Lake Allatoona.


Assuntos
Água Doce/análise , Modelos Químicos , Fósforo/análise , Solo/análise , Poluição Química da Água/análise , Georgia
2.
J Environ Qual ; 38(1): 121-9, 2009.
Artigo em Inglês | MEDLINE | ID: mdl-19141801

RESUMO

Lake Allatoona is a large reservoir northeast of metropolitan Atlanta, GA, threatened by excessive algal growth. We used the calibrated Soil and Water Assessment Tool (SWAT) models developed in our companion paper to estimate the annual P load to Lake Allatoona in 1992 and in 2001 after significant changes occurred in land use. Land use data in 1992 and 2001 from the Multi-Resolution Land Characteristics (MRLC) Consortium showed that forest land use decreased during this period by about 20%, urban land use increased by about 225%, and pasture land uses increased by about 50%. Simulation results showed that the P load to Lake Allatoona increased from 176.5 to 207.3 Mg, which were 87.8% and 103.1%, respectively, of the total P (TP) annual cap (201 Mg) set by the Georgia Environmental Protection Division (GAEPD) for discharge into Lake Allatoona. In the early 1990s, the greatest sources of the TP load to Lake Allatoona (and their percentages of the total load) were pasture (33.6%), forest (27.5%), and point sources (25.0%). Urban land uses contributed about 6.0% and row-crop agriculture contributed about 6.8%. A decade later, the greatest two TP sources were pasture (52.7%) and urban (20.9%) land uses. Point-source P loads decreased significantly to 11.6%. Permit limits on poultry processing plants reduced the point-source P loads, but increasing urban and pasture land uses increased nonpoint sources of P. To achieve further reductions in the P load to Lake Allatoona, contributions from pasture and urban nonpoint sources will need to be addressed.


Assuntos
Agricultura , Modelos Químicos , Fósforo/análise , Solo/análise , Urbanização/tendências , Água Doce/análise , Georgia , Poluição Química da Água/análise
SELEÇÃO DE REFERÊNCIAS
DETALHE DA PESQUISA
...