Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 1 de 1
Filtrar
Mais filtros








Base de dados
Intervalo de ano de publicação
1.
Rev Sci Instrum ; 83(2): 02A732, 2012 Feb.
Artigo em Inglês | MEDLINE | ID: mdl-22380241

RESUMO

Since 2009, the Spallation Neutron Source (SNS) has been producing neutrons with ion beam powers near 1 MW, which requires the extraction of ∼50 mA H(-) ions from the ion source with a ∼5% duty factor. The 50 mA are achieved after an initial dose of ∼3 mg of Cs and heating the Cs collar to ∼170 °C. The 50 mA normally persist for the entire 4-week source service cycles. Fundamental processes are reviewed to elucidate the persistence of the SNS H(-) beams without a steady feed of Cs and why the Cs collar temperature may have to be kept near 170 °C.

SELEÇÃO DE REFERÊNCIAS
DETALHE DA PESQUISA