Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 2 de 2
Filtrar
Mais filtros








Base de dados
Intervalo de ano de publicação
1.
J Nurs Adm ; 53(6): 313-318, 2023 Jun 01.
Artigo em Inglês | MEDLINE | ID: mdl-37184482

RESUMO

Ambulatory staffing to workload based on visit volume in an outpatient setting is an elusive formula, and the literature describing such processes is limited. One health system tasked a multidisciplinary team with developing an ambulatory staffing to workload tool to meet the needs of staff, management, and leadership. The resultant tool includes an automated dashboard for determining staffing needs on the basis of quantified workload, prospective modeling, and historical dashboards to demonstrate actual staffing (full-time equivalents) to workload (outpatient volumes) compared with budget.


Assuntos
Instituições de Assistência Ambulatorial , Liderança , Admissão e Escalonamento de Pessoal , Carga de Trabalho , Humanos , Recursos Humanos , Instituições de Assistência Ambulatorial/organização & administração , Equipe de Assistência ao Paciente
2.
Infez Med ; 30(4): 577-586, 2022.
Artigo em Inglês | MEDLINE | ID: mdl-36482956

RESUMO

Pseudomonas aeruginosa infection causes high morbidity and mortality, especially in immunocompromised patients. Pseudomonas can develop multidrug resistance. As a result, it can cause serious outbreaks in hospital and intensive care unit (ICU) settings, increasing both length of stay and costs. In the second quarter of 2020, in a community hospital's 15-bed ICU, the P. aeruginosa-positive sputum culture rate was unacceptably high, with a trend of increasing prevalence over the previous 3 quarters. We performed a multidisciplinary quality improvement (QI) initiative to decrease the P. aeruginosa-positive rate in our ICU. We used the Define, Measure, Analyze, Improve, and Control model of Lean Six Sigma for our QI initiative to decrease the P. aeruginosa-positive sputum culture rate by 50% over the following year without affecting the baseline environmental services cleaning time. A Plan-Do-Study-Act approach was used for key interventions, which included use of sterile water for nasogastric and orogastric tubes, adherence to procedure for inline tubing and canister exchanges, replacement of faucet aerators, addition of hopper covers, and periodic water testing. We analyzed and compared positive sputum culture rates quarterly from pre-intervention to post-intervention. The initial P. aeruginosa-positive culture rate of 10.98 infections per 1,000 patient-days in a baseline sample of 820 patients decreased to 3.44 and 2.72 per 1,000 patient-days in the following 2 post-intervention measurements. Environmental services cleaning time remained stable at 34 minutes. Multiple steps involving all stakeholders were implemented to maintain this progress. A combination of multidisciplinary efforts and QI methods was able to prevent a possible ICU P. aeruginosa outbreak.

SELEÇÃO DE REFERÊNCIAS
DETALHE DA PESQUISA