Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 1 de 1
Filtrar
Mais filtros








Base de dados
Intervalo de ano de publicação
1.
Sci Rep ; 14(1): 10961, 2024 May 14.
Artigo em Inglês | MEDLINE | ID: mdl-38745071

RESUMO

This paper introduces new contributions for construction procedures designed to enhance the robustness and precision of stress control in active anchorage and short presetressing units for long-span bridges, particularly addressing potential technical risks. The primary focus is on optimizing stress management for bridge stays, suspension cables, and short prestressing units by emphasizing a unified parameter: stress. The contributions of this research encompass (1) the introduction of advanced load cells for stress control in active anchorages and (2) the implementation of a novel synchronized multi-strain gage load cell network for short prestressing units, crucial in situations where prestressing losses can attain significant magnitudes. To validate these advancements, the authors present (3) a practical experience and results obtained from applying these methodologies in monitoring the structural response during the construction of the Tajo Bridge using the cable-stayed cantilever technique.

SELEÇÃO DE REFERÊNCIAS
DETALHE DA PESQUISA