RESUMO
This paper presents the results of the simulation of a sewage sludge combustion plant with a productivity of 6 tons per hour using the ASPEN Plus. It is shown that catalytic combustion technology can be used for the efficient utilization of mechanically dehydrated sludge with the moisture of ~75% in autothermal mode (without the use of additional fuel). At the same time, the plant for utilization of 6.0 tons of sludge per hour enables us to obtain 3.07â¯MW of heat energy. It is shown that the sludge moisture and its calorific value significantly affect the combustion process. Thus, at the moisture of less than 72%, additional water supply is necessary to avoid overheating of the catalyst bed. In the case of an increase in sludge moisture of more than 76%, an additional supply of fuel (for example, brown coal) is required. Also, the article discusses the emissions of harmful substances generated during sewage sludge combustion and methods for their utilization.