Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 14 de 14
Filtrar
Mais filtros








Base de dados
Intervalo de ano de publicação
1.
Rev Sci Instrum ; 90(11): 113305, 2019 Nov 01.
Artigo em Inglês | MEDLINE | ID: mdl-31779447

RESUMO

The Banc d'Etude et de Tests des Sources d'Ions (BETSI) test bench was built in 2009 for the Spiral2 project. Year after year, upgrades were done on the low energy beam line in order to have a complete injector equipped with 2 solenoids and vacuum chambers with multiple viewports for various kinds of beam-diagnostics. BETSI was designed for a 50 kV high voltage, and all the sources that were installed on the platform were also designed for that voltage. As the advanced light ion source extraction system ions source family is getting larger, the design is made for higher extraction voltages. As the common extraction voltage is 100 kV, the BETSI platform was upgraded to this voltage value. The control-command was upgraded, and at this voltage, a great care on the electromagnetic protections was taken in order to protect the equipment when spark occurs. This paper describes the choice of the upgrade, its installation, and some performances already obtained with a permanent magnet ion source equipped with a large accelerating tube.

2.
Rev Sci Instrum ; 89(5): 052303, 2018 May.
Artigo em Inglês | MEDLINE | ID: mdl-29864844

RESUMO

The CEA at Saclay is in charge of developing and building the ion source and the low energy line of the proton linac of the FAIR (Facility for Antiproton and Ion Research) accelerator complex located at GSI (Darmstadt) in Germany. The FAIR facility will deliver stable and rare isotope beams covering a huge range of intensities and beam energies for experiments in the fields of atomic physics, plasma physics, nuclear physics, hadron physics, nuclear matter physics, material physics, and biophysics. A significant part of the experimental program at FAIR is dedicated to antiproton physics that requires an ultimate number 7 × 1010 cooled pbar/h. The high-intensity proton beam that is necessary for antiproton production will be delivered by a dedicated 75 mA/70 MeV proton linac. A 2.45 GHz microwave ion source will deliver a 100 mA H+ beam pulsed at 4 Hz with an energy of 95 keV. A 2 solenoids low energy beam transport line allows the injection of the proton beam into the radio frequency quadrupole (RFQ) within an acceptance of 0.3π mm mrad (norm. rms). An electrostatic chopper system located between the second solenoid and the RFQ is used to cut the beam macro-pulse from the source to inject 36 µs long beam pulses into the RFQ. At present time, a Ladder-RFQ is under construction at the University of Frankfurt. This article reports the first beam measurements obtained since mid of 2016. Proton beams have been extracted from the ECR ion source and analyzed just after the extraction column on a dedicated diagnostic chamber. Emittance measurements as well as extracted current and species proportion analysis have been performed in different configurations of ion source parameters, such as magnetic field profile, radio frequency power, gas injection, and puller electrode voltage.

3.
Rev Sci Instrum ; 87(2): 02A705, 2016 Feb.
Artigo em Inglês | MEDLINE | ID: mdl-26931923

RESUMO

The high current ion source with the low energy beam transport (LEBT) will serve as injector into the proton LINAC to provide primary proton beam for the production of antiprotons. The pulsed ion source developed and built in CEA/Saclay operates with a frequency of 2.45 GHz based on ECR plasma production with two coils with 87.5 mT magnetic field necessary for the electron cyclotron resonance. The compact LEBT consists of two solenoids with a maximum magnetic field of 500 mT including two integrated magnetic steerers to adjust the horizontal and vertical beam positions. The total length of the compact LEBT is 2.3 m and was made as short as possible to reduced emittance growth along the beam line. To measure ion beam intensity behind the pentode extraction system, between solenoids and at the end of the beam line, two current transformers and a Faraday cup are installed. To get information about the beam quality and position, the diagnostic chamber with different equipment will be installed between the two solenoids. This article reports the current status of the proton injector for the facility of antiproton and ion research.

4.
Rev Sci Instrum ; 87(2): 02A733, 2016 Feb.
Artigo em Inglês | MEDLINE | ID: mdl-26931951

RESUMO

The SPIRAL2 injector, installed in its tunnel, is currently under commissioning at GANIL, Caen, France. The injector is composed of two low energy beam transport lines: one is dedicated to the light ion beam production, the other to the heavy ions. The first light ion beam, created by a 2.45 GHz electron cyclotron resonance ion source, has been successfully produced in December 2014. The first beam of the PHOENIX V2 18 GHz heavy ion source was analyzed on 10 July 2015. A status of the SPIRAL2 injector commissioning is given. An upgrade of the heavy ion source, named PHOENIX V3 aimed to replace the V2, is presented. The new version features a doubled plasma chamber volume and the high charge state beam intensity is expected to increase by a factor of 1.5 to 2 up to the mass ∼50. A status of its assembly is proposed.

5.
Rev Sci Instrum ; 87(2): 02B938, 2016 Feb.
Artigo em Inglês | MEDLINE | ID: mdl-26932110

RESUMO

Experiments to investigate the space charge compensation of pulsed high-current heavy ion beams are performed at the GSI ion source text benches with a 4-grid analyzer provided by CEA/Saclay. The technical design of the 4-grid analyzer is revised to verify its functionality for measurements at pulsed high-current heavy ion beams. The experimental investigation of space charge compensation processes is needed to increase the performance and quality of current and future accelerator facilities. Measurements are performed directly downstream a triode extraction system mounted to a multi-cusp ion source at a high-current test bench as well as downstream the post-acceleration system of the high-current test injector (HOSTI) with ion energies up to 120 keV/u for helium and argon. At HOSTI, a cold or hot reflex discharge ion source is used to change the conditions for the measurements. The measurements were performed with helium, argon, and xenon and are presented. Results from measurements with single aperture extraction systems are shown.

6.
Rev Sci Instrum ; 85(2): 02A713, 2014 Feb.
Artigo em Inglês | MEDLINE | ID: mdl-24593447

RESUMO

To avoid saturation, beam current transformers must be shielded from solenoid, quad, and RFQ high stray fields. Good understanding of field distribution, shielding materials, and techniques is required. Space availability imposes compact shields along the beam pipe. This paper describes compact effective concatenated magnetic shields for IFMIF-EVEDA LIPAc LEBT and MEBT and for FAIR Proton Linac injector. They protect the ACCT Current Transformers beyond 37 mT radial external fields. Measurements made at Saclay on the SILHI source are presented.

7.
Rev Sci Instrum ; 85(2): 02A939, 2014 Feb.
Artigo em Inglês | MEDLINE | ID: mdl-24593518

RESUMO

During the past two years, a new ECR 2.45 GHz type ion source has been developed especially dedicated to intense light ion injector project like IPHI (Injecteur Proton Haute Intensité), IFMIF (International Fusion Materials Irradiation Facility), to reduce beam emittance at RFQ entrance by shortening the length of the LEBT. This new ALISES concept (Advanced Light Ion Source Extraction System) is based on the use of an additional LEBT short length solenoid very close to the extraction aperture. The fringe field of this new solenoid produces the needed magnetic field to create the ECR resonance in the plasma chamber. Such geometry allows first putting the solenoid at ground potential, while saving space in front of the extraction to move the first LEBT solenoid closer and focus earlier the intense extracted beam. During the commissioning of the source in 2011-2012, ALISES has produced about 20 mA extracted from a 6 mm diameter plasma extraction hole at 23 kV. But the magnetic configuration combined to the new extraction system geometry led to important Penning discharge conditions in the accelerator column. Lots of them have been eliminated by inserting glass pieces between electrodes to modify equipotential lines with unfavorable ExB vacuum zones where particles were produced and trapped. To study Penning discharge location, several 3D calculations have been performed with OPERA-3D/TOSCA code to simulate the possible production and trapping of electrons in the extraction system. The results obtained on different sources already built have shown very good agreement with sparks location observed experimentally on electrodes. The simulations results as well as experimental measurements are presented and solutions to prevent possible Penning discharge in future source geometries are established.

8.
Rev Sci Instrum ; 83(2): 02A307, 2012 Feb.
Artigo em Inglês | MEDLINE | ID: mdl-22380154

RESUMO

One of the main goal of intense light ion injector projects such as IPHI, IFMIF, or SPIRAL2, is to produce high current beams while keeping transverse emittance as low as possible. To prevent emittance growth induced in a dual solenoid low energy transfer line, its length has to be minimized. This can be performed with the advanced light ion source extraction system concept that we are developing: a new ECR 2.45 GHz type ion source based on the use of an additional low energy beam transport (LEBT) short length solenoid close to the extraction aperture to create the resonance in the plasma chamber. The geometry of the source has been considerably modified to allow easy maintenance of each component and to save space in front of the extraction. The source aims to be very flexible and to be able to extract high current ion beams at energy up to 100 kV. A specific experimental setup for this source is under installation on the BETSI test bench, to compare its performances with sources developed up to now in the laboratory, such as SILHI, IFMIF, or SPIRAL2 ECR sources. This original extraction source concept is presented, as well as electromagnetic simulations with OPERA-2D code. Ion beam extraction in space charge compensation regime with AXCEL, and beam dynamics simulation with SOLMAXP codes show the beam quality improvement at the end of the LEBT.

9.
Rev Sci Instrum ; 83(2): 02A316, 2012 Feb.
Artigo em Inglês | MEDLINE | ID: mdl-22380163

RESUMO

The production of rare radioactive ion beam (RIB) far from the valley of stability is one of the final purposes of the Spiral2 facility in Caen. The RIB will be produced by impinging a deuteron beam onto a carbon sample to produce a high neutron flux, which will interact with a uranium target. The primary deuteron beam is produced by an ion source based on ECR plasma generation. The deuteron source and the low energy beam transport (LEBT) has been assembled and tested at CEA Saclay. Diagnostics from other laboratories were implemented on the LEBT in order to characterize the deuteron beam produced and compare it to the initial simulations. The ion source has been based on a SILHI-type source, which has demonstrated good performances in pulsed and continuous mode, and also a very good reliability on long term operation. The 5 mA of deuteron beam required at the RFQ entrance is extracted from the plasma source at the energy of 40 kV. After a brief description of the experimental set-up, this article reports on the first beam characterization experiments.

10.
Rev Sci Instrum ; 83(2): 02A349, 2012 Feb.
Artigo em Inglês | MEDLINE | ID: mdl-22380196

RESUMO

By the 90s, the CEA has undertaken to develop the production of intense light ion beams from unconfined ECR plasma. Today, three sources for IPHI, SPIRAL2, and IFMIF projects (respectively, 100 mA of H(+), 8 mA of D(+), and 140 mA of D(+)) are installed at CEA∕Saclay. In order to improve performances and decrease dimensions of these sources, it is necessary to better understand the mechanisms involved in the production and extraction of particles. As a consequence, theoretical and experimental studies are being carried out. We present a theoretical study based on SOLMAXP, a home-made particle-in-cell code. The aim is to investigate the possibility of reducing the plasma chamber size without loss of beam characteristics. This code has been validated by beam intensity measurements on a permanent magnet based source, producing a proton beam of 30 mA at 40 kV on the test bench BETSI. In order to reduce experimentally the dimensions of plasma chamber, a new source, named ALISES with variable plasma chamber volume, is under assembly.

11.
Rev Sci Instrum ; 79(2 Pt 2): 02B303, 2008 Feb.
Artigo em Inglês | MEDLINE | ID: mdl-18315169

RESUMO

In the framework of the IFMIF-EVEDA phase (International Fusion Materials Irradiation Facility-Engineering Validation and Engineering Design Activities), the CEA-Saclay is in charged of the design and realization of the 140 mA cw deuteron source. The IFMIF EVEDA demonstrator will be installed in Japan in the next six years and will have to accelerate the deuteron beam up to 9 MeV. CEA will build the source and the low energy beam line (LEBT) and will test the cw high intensity deuteron production at Saclay. The SILHI source is an electron cyclotron resonance (ECR) source, operating at 2.45 GHz. In 2001, it produced more than 130 mA of deuteron beam in pulsed mode to minimize neutron production. Such a result pushes to develop a new ECR source based on the SILHI design and equipped with a specific extraction system. Several options of the accelerator column will be implemented in order to improve the reliability and the efficiency of the source. The IFMIF source and LEBT design will be reported.

12.
Rev Sci Instrum ; 79(2 Pt 2): 02B703, 2008 Feb.
Artigo em Inglês | MEDLINE | ID: mdl-18315194

RESUMO

The goal of this article is to present simulations on the extraction from an electron cyclotron resonance ion source (ECRIS). The aim of this work is to find out an extraction system, which allows one to reduce the emittances and to increase the current of the extracted ion beam at the focal point of the analyzing dipole. But first, we should locate the correct software which is able to reproduce the specific physics of an ion beam. To perform the simulations, the following softwares have been tested: SIMION 3D, AXCEL, CPO 3D, and especially, for the magnetic field calculation, MATHEMATICA coupled with the RADIA module. Emittance calculations have been done with two types of ECRIS: one with a hexapole and one without a hexapole, and the difference will be discussed.

13.
Rev Sci Instrum ; 79(2 Pt 2): 02B710, 2008 Feb.
Artigo em Inglês | MEDLINE | ID: mdl-18315201

RESUMO

In the framework of several International HPPA projects (such as IFMIF, IPHI, and Spiral2) the CEA handles the design and the developments of several electron cyclotron resonance (ECR) ion sources. For the IFMIF EVEDA demonstrator, a 140 mA cw extracted deuteron beam will be required for high yield of neutron production. For radioactive ion production in the Spiral2 project, several milliamperes of deuterons will be delivered with a permanent magnet source. The optimization of the beam quality at the entrance of the radio frequency quadropole (RFQ) accelerator system triggered the need of a new test bench for ion source optimization and beam qualification. The BETSI ion source test bench will operate up to 50 kV and ignite cw or pulsed hydrogen plasma with a 2.45 GHz magnetron. Great care has already been taken to design electrostatic optics of the extraction system to minimize the emittance growth. Plasma diagnostics will be inserted in the source chamber and several beam diagnostics (emittance and current measurements, beam species analysis) will also be implemented on the low energy beam line transport (LEBT). These diagnostics allow the simultaneous analysis of the beam quality with the plasma parameters of the source. Regional funding request will also be needed to improve the LEBT for space charge compensation measurements. The design of the present and upgraded test bench will be reported as well as the first extracted beam analysis.

14.
Rev Sci Instrum ; 79(2 Pt 2): 02B723, 2008 Feb.
Artigo em Inglês | MEDLINE | ID: mdl-18315214

RESUMO

Based on the experience of the SILHI electron cyclotron resonance (ECR) ion source for the IPHI accelerator, which produces routinely 100-120 mA H(+) beam, the CEA-Saclay is in charge of the design and realization of the 140 mA cw deuteron source for the IFMIF project (International Fusion Materials Irradiation Facility). IFMIF is an accelerator-based neutron irradiation facility consisting of two accelerators of 125 mA D(+) beam at 40 MeV that hit in parallel a lithium target. IFMIF utilizes the deuteron-lithium (d-Li) neutron, producing a reaction to simulate the 14 MeV neutron environment in deuterium-tritium (D-T) fusion reactors. In the framework of the IFMIF EVEDA phase (Engineering Validation and Engineering Design Activities), we are studying a cw ECR ion source with a new extraction system to allow high current extraction while keeping a low divergence as well as a small emittance. Starting from SILHI five-electrode system with H(+) ions, the extracted beam characteristics as well as electric field conditions are compared with the cases of four- and three-electrode extraction systems. Experimental results made on the SILHI source with H(+) ions are briefly discussed. Extensive experimental results on the new source test bench BETSI are expected as soon as the design and fabrication of a dedicated extraction system with a new set of electrodes will be finished.

SELEÇÃO DE REFERÊNCIAS
DETALHE DA PESQUISA