Continuous thermal hydrolysis and energy integration in sludge anaerobic digestion plants.
Water Sci Technol
; 57(8): 1221-6, 2008.
Article
em En
| MEDLINE
| ID: mdl-18469393
A thermal hydrolysis pilot plant with direct steam injection heating was designed and constructed. In a first period the equipment was operated in batch to verify the effect of sludge type, pressure and temperature, residence time and solids concentration. Optimal operation conditions were reached for secondary sludge at 170 degrees C, 7 bar and 30 minutes residence time, obtaining a disintegration factor higher than 10, methane production increase by 50% and easy centrifugation In a second period the pilot plant was operated working with continuous feed, testing the efficiency by using two continuous anaerobic digester operating in the mesophilic and thermophilic range. Working at 12 days residence time, biogas production increases by 40-50%. Integrating the energy transfer it is possible to design a self-sufficient system that takes advantage of this methane increase to produce 40% more electric energy.
Texto completo:
1
Coleções:
01-internacional
Contexto em Saúde:
2_ODS3
Base de dados:
MEDLINE
Assunto principal:
Esgotos
/
Bactérias Anaeróbias
/
Eliminação de Resíduos
/
Conservação de Recursos Energéticos
/
Reatores Biológicos
Idioma:
En
Revista:
Water Sci Technol
Ano de publicação:
2008
Tipo de documento:
Article