Your browser doesn't support javascript.
loading
Monitoring and Prediction of Horizontal Displacement of Underground Enclosure Piles in Subway Foundation Pits.
Dong, Yue; Luan, Yuanzhong; Wang, Fei; Yang, Huilong; Jia, Zheng; Luan, Hengxuan.
Afiliação
  • Dong Y; College of Geodesy and Geomatics, Shandong University of Science and Technology, Qingdao 266590, China.
  • Luan Y; College of Geodesy and Geomatics, Shandong University of Science and Technology, Qingdao 266590, China.
  • Wang F; College of Geodesy and Geomatics, Shandong University of Science and Technology, Qingdao 266590, China.
  • Yang H; Shandong Branch of China National Geological Exploration Center of Building Materials Industry, Jinan 250000, China.
  • Jia Z; China Coal Electric Co., Ltd., Beijing 101300, China.
  • Luan H; College of Geodesy and Geomatics, Shandong University of Science and Technology, Qingdao 266590, China.
ACS Omega ; 8(26): 23389-23400, 2023 Jul 04.
Article em En | MEDLINE | ID: mdl-37426226
ABSTRACT
Urban rail transportation and underground space development and utilization are initiatives to solve urban traffic congestion. The monitoring and prediction of the stability of underground enclosure piles in foundation pits is a key index for the dynamic evaluation of the stability of underground space engineering. In this paper, we focused on the problem that the dynamic prediction accuracy and stability of foundation pit retaining piles in the Qingdao area are not high. Based on the analysis of various time function curves and the physical meaning of the parameters, we proposed the Adjusted-Logistic time function model, which introduces three physical parameters to adjust the deformation velocity and deformation acceleration in different stages for better accuracy. It could predict the deformation process of underground enclosure piles under different geological engineering conditions. It was verified in the field that the root-mean-square error (RMSE) of the Adjusted-Logistic function was 0.5316, MAE was 0.3752, and R2 was 0.9937, which were better than those of Gompertz, Weibull, and Knothe time function models. Meanwhile, it showed that with the increase of excavation depth, the maximum horizontal displacement of the underground enclosure piles gradually decreased and finally stabilized at 0.62-0.71 H. We established a catastrophe model of the horizontal displacement cusp at the observation point of the underground enclosure piles by using the time series of the measured data. It could determine the weak location of the underground enclosure pile stability and realize the multipoint warning of the foundation pit stability, which would ensure safe construction.

Texto completo: 1 Coleções: 01-internacional Base de dados: MEDLINE Tipo de estudo: Prognostic_studies / Risk_factors_studies Idioma: En Revista: ACS Omega Ano de publicação: 2023 Tipo de documento: Article País de afiliação: China

Texto completo: 1 Coleções: 01-internacional Base de dados: MEDLINE Tipo de estudo: Prognostic_studies / Risk_factors_studies Idioma: En Revista: ACS Omega Ano de publicação: 2023 Tipo de documento: Article País de afiliação: China