1.
Zhongguo Yi Liao Qi Xie Za Zhi
; 39(6): 421-2, 431, 2015 Nov.
Artículo
en Zh
| MEDLINE
| ID: mdl-27066682
RESUMEN
According to current assembly situation of infant incubator in company A, basic industrial engineering means such as time study was used to analyze the actual products assembly production and an assembly line was designed. The assembly line was modeled and simulated with software Flexsim. The problem of the assembly line was found by comparing simulation result and actual data, then through optimization to obtain high efficiency assembly line.