Insights on mechanisms of excess sludge minimization in an oxic-settling-anaerobic process under different operating conditions and plant configurations.
Corsino, Santo Fabio; Carabillò, Michele; Cosenza, Alida; De Marines, Federica; Di Trapani, Daniele; Traina, Francesco; Torregrossa, Michele; Viviani, Gaspare.
Afiliação
  • Corsino SF; Department of Engineering, University of Palermo, Viale Delle Scienze, Building 8, 90128, Palermo, Italy. Electronic address: santofabio.corsino@unipa.it.
  • Carabillò M; Department of Engineering, University of Palermo, Viale Delle Scienze, Building 8, 90128, Palermo, Italy.
  • Cosenza A; Department of Engineering, University of Palermo, Viale Delle Scienze, Building 8, 90128, Palermo, Italy.
  • De Marines F; Department of Engineering, University of Palermo, Viale Delle Scienze, Building 8, 90128, Palermo, Italy.
  • Di Trapani D; Department of Engineering, University of Palermo, Viale Delle Scienze, Building 8, 90128, Palermo, Italy.
  • Traina F; Department of Engineering, University of Palermo, Viale Delle Scienze, Building 8, 90128, Palermo, Italy.
  • Torregrossa M; Department of Engineering, University of Palermo, Viale Delle Scienze, Building 8, 90128, Palermo, Italy.
  • Viviani G; Department of Engineering, University of Palermo, Viale Delle Scienze, Building 8, 90128, Palermo, Italy.
Chemosphere ; 312(Pt 1): 137090, 2023 Jan.
Article em En | MEDLINE | ID: mdl-36334748
In the present research, insights about the mechanisms of excess sludge minimization occurring in an oxic-settling-anaerobic (OSA) were provided. The investigation involved two systems operating in parallel. In particular, a conventional activated sludge (CAS) system as control and a system implementing the OSA process both having a pre-denitrification scheme were considered. Five periods (P1-P5) were studied, during which several operating conditions and configurations were tested. Specifically, the hydraulic retention time (HRT) in the anaerobic reactor of the OSA system (P1 8 h, P2-P3 12 h, P4 8 h, P5 12 h) and the return sludge from the anaerobic to the anoxic (scheme A) (P1-P2) or aerobic (scheme B) mainstream reactors (P3-P5) were investigated. The results highlighted that the excess sludge production in the OSA was lower in all the configurations (12-41%). In more detail, the observed yield (Yobs) was reduced from 0.50-0.89 gTSS gCOD-1 (control) to 0.22 -0.34 gTSS gCOD-1 in the OSA process. The highest excess sludge reduction (40%) was achieved when the OSA was operated according to scheme B and HRT of 12 h in the anaerobic reactor (P3). Generally, scheme A enabled the establishment of cell lysis and extracellular polymeric substances (EPS) destructuration, leading to a worsening of process performances when high anaerobic HRT (>8 h) was imposed. In contrast, scheme B enabled the establishment of maintenance metabolism in addition to the uncoupling metabolism, while cell lysis and EPS destruction were minimized. This allowed obtaining higher sludge reduction yield without compromising the effluent quality.
Assuntos
Palavras-chave

Texto completo: 1 Base de dados: MEDLINE Assunto principal: Esgotos / Eliminação de Resíduos Líquidos Idioma: En Revista: Chemosphere Ano de publicação: 2023 Tipo de documento: Article

Texto completo: 1 Base de dados: MEDLINE Assunto principal: Esgotos / Eliminação de Resíduos Líquidos Idioma: En Revista: Chemosphere Ano de publicação: 2023 Tipo de documento: Article