Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 1 de 1
Filtrar
Mais filtros

Base de dados
Ano de publicação
Tipo de documento
Intervalo de ano de publicação
1.
Artigo em Inglês | MEDLINE | ID: mdl-36554413

RESUMO

Extensive hydrological analysis is carried out to estimate floods for the Batu Dam, a hydropower dam located in the urban area upstream of Kuala Lumpur, Malaysia. The study demonstrates the operational state and reliability of the dam structure based on hydrologic assessment of the dam. The surrounding area is affected by heavy rainfall and climate change every year, which increases the probability of flooding and threatens a dense population downstream of the dam. This study evaluates the adequacy of dam spillways by considering the latest Probable Maximum Precipitation (PMP) and Probable Maximum Flood (PMF) values of the concerned dams. In this study, the PMP estimations are applied using comparison of both statistical method by Hershfield and National Hydraulic Research Institute of Malaysia (NAHRIM) Envelope Curve as input for PMF establishments. Since the PMF is derived from the PMP values, the highest design flood standard can be applied to any dam, ensuring inflow into the reservoirs and limiting the risk of dam structural failure. Hydrologic modeling using HEC-HMS provides PMF values for the Batu dam. Based on the results, Batu Dam is found to have 200.6 m3/s spillway discharge capacities. Under PMF conditions, the Batu dam will not face overtopping since the peak outflow of the reservoir level is still below the crest level of the dam.


Assuntos
Mudança Climática , Inundações , Malásia , Reprodutibilidade dos Testes , Probabilidade
SELEÇÃO DE REFERÊNCIAS
DETALHE DA PESQUISA