Impact of Lean on surgical instrument reduction: Less is more.
Wannemuehler, Todd J; Elghouche, Alhasan N; Kokoska, Mimi S; Deig, Christopher R; Matt, Bruce H.
Afiliação
  • Wannemuehler TJ; Department of Otolaryngology-Head and Neck Surgery, Indiana University School of Medicine, Indianapolis, Indiana, U.S.A.
  • Elghouche AN; Department of Otolaryngology-Head and Neck Surgery, Indiana University School of Medicine, Indianapolis, Indiana, U.S.A.
  • Kokoska MS; Department of Otolaryngology-Head and Neck Surgery, Indiana University School of Medicine, Indianapolis, Indiana, U.S.A.
  • Deig CR; Aurora Health Care Medical Group, Milwaukee, Wisconsin, U.S.A.
  • Matt BH; Department of Otolaryngology-Head and Neck Surgery, Indiana University School of Medicine, Indianapolis, Indiana, U.S.A.
Laryngoscope ; 125(12): 2810-5, 2015 Dec.
Article em En | MEDLINE | ID: mdl-26109515
ABSTRACT
OBJECTIVES/

HYPOTHESIS:

To determine whether instrument sets that are frequently used by multiple surgeons can be substantially reduced in size with consensus. STUDY

DESIGN:

Prospective quality improvement study using Lean Six Sigma for purposeful and consensual reduction of non-value-added instruments in adenotonsillectomy instrument sets.

METHODS:

Value stream mapping was utilized to determine instrumentation usage and reprocessing workflow. Preintervention instrument utilization surveys allowed consensual and intelligent set reduction. Non-value-added instruments were targeted for waste elimination by placement in a supplemental set. Times for pre- and postintervention instrument assembly, Mayo setup, and surgery were collected for adenotonsillectomies. Postintervention satisfaction surveys of surgeons and staff were conducted.

RESULTS:

Adenotonsillectomy sets were reduced from 52 to 24 instruments. Median assembly times were significantly reduced from 8.4 to 4.7 minutes (P < .0001) with a set assembly cost reduction of 44%. Following natural log transformations, mean Mayo setup times were significantly reduced from 97.6 to 76.1 seconds (P < .0001), and mean operative times were not significantly affected (1,773 vs. 1,631 seconds, P > .05). The supplemental set was opened in only 3.6% of cases. Satisfaction was >90% regarding the intervention. Set build cost was reduced by $1,468.99 per set.

CONCLUSIONS:

Lean Six Sigma improves efficiency and reduces waste by empowering team members to improve their environment. Instrument set reduction is ideal for waste elimination because of tool accumulation over time and instrument obsolescence as newer technologies are adopted. Similar interventions could easily be applied to larger sinus, mastoidectomy, and spine sets. LEVEL OF EVIDENCE NA.
Assuntos
Palavras-chave

Texto completo: 1 Base de dados: MEDLINE Assunto principal: Instrumentos Cirúrgicos / Tonsilectomia / Adenoidectomia / Gestão da Qualidade Total / Desenho de Equipamento Idioma: En Ano de publicação: 2015 Tipo de documento: Article

Texto completo: 1 Base de dados: MEDLINE Assunto principal: Instrumentos Cirúrgicos / Tonsilectomia / Adenoidectomia / Gestão da Qualidade Total / Desenho de Equipamento Idioma: En Ano de publicação: 2015 Tipo de documento: Article