Your browser doesn't support javascript.
loading
[Effects of Hydraulic Loading Rate on the Removal of Pollutants from an Integrated Biological Settling Tank].
Wang, Wen-Dong; Ma, Cui; Liu, Hui; Fan, Yin-Ping; Liu, Guo-Qi; Zhang, Ke.
Afiliação
  • Wang WD; School of Environmental and Municipal Engineering, Xi'an University of Architecture and Technology, Xi'an 710055, China.
  • Ma C; Department of Environmental Technology and Ecology, Yangtze Delta Region Institute of Tsinghua University, Jiaxing 314006, China.
  • Liu H; School of Environmental and Municipal Engineering, Xi'an University of Architecture and Technology, Xi'an 710055, China.
  • Fan YP; School of Environmental and Municipal Engineering, Xi'an University of Architecture and Technology, Xi'an 710055, China.
  • Liu GQ; School of Environmental and Municipal Engineering, Xi'an University of Architecture and Technology, Xi'an 710055, China.
  • Zhang K; School of Environmental and Municipal Engineering, Xi'an University of Architecture and Technology, Xi'an 710055, China.
Huan Jing Ke Xue ; 37(12): 4727-4733, 2016 Dec 08.
Article em Zh | MEDLINE | ID: mdl-29965314

Texto completo: 1 Base de dados: MEDLINE Assunto principal: Poluentes Químicos da Água / Eliminação de Resíduos Líquidos / Purificação da Água / Nitrificação Idioma: Zh Ano de publicação: 2016 Tipo de documento: Article

Texto completo: 1 Base de dados: MEDLINE Assunto principal: Poluentes Químicos da Água / Eliminação de Resíduos Líquidos / Purificação da Água / Nitrificação Idioma: Zh Ano de publicação: 2016 Tipo de documento: Article