Critical Care Surge Capacity to Respond to the COVID-19 Pandemic in Italy: A Rapid and Affordable Solution in the Novara Hospital.
Prehosp Disaster Med
; 35(4): 431-433, 2020 Aug.
Article
em En
| MEDLINE
| ID: mdl-32423513
The rapid insurgence and spread of coronavirus disease 2019 (COVID-19) exceeded the limit of the intensive care unit (ICU) contingency plan of the Maggiore della Carità University Hospital (Novara, Italy) generating a crisis management condition. This brief report describes how a prompt response to the sudden request of invasive mechanical ventilation (IMV) was provided by addressing the key elements of health care system surge capacity from contingency to crisis. In a short time and at a relatively low cost, a structural modification of a hospital aisle allowed to convert the general ICU into a COVID-19 unit, increasing the number of COVID-19 critical care beds by 107%.
Palavras-chave
Texto completo:
1
Base de dados:
MEDLINE
Assunto principal:
Pneumonia Viral
/
Ventiladores Mecânicos
/
Infecções por Coronavirus
/
Cuidados Críticos
/
Capacidade de Resposta ante Emergências
/
Arquitetura Hospitalar
Idioma:
En
Ano de publicação:
2020
Tipo de documento:
Article