Your browser doesn't support javascript.
loading
Intelligent Optimization of Tower Crane Location and Layout Based on Firefly Algorithm.
Liu, Cong; Zhang, Fangqing; Han, Xiaojian; Ye, Hongyu; Shi, Zanxi; Zhang, Jie; Wang, Tiankuo; She, Jianjun; Zhang, Tianyue.
Afiliação
  • Liu C; College of Civil Engineering, Nanjing Tech University, Nanjing 211816, China.
  • Zhang F; Urban Planning and Design Institute, China Design Group Co., Ltd., Nanjing 210014, China.
  • Han X; College of Civil Engineering, Nanjing Tech University, Nanjing 211816, China.
  • Ye H; School of Architecture, Southeast University, Nanjing 210096, China.
  • Shi Z; College of Civil Engineering, Nanjing Tech University, Nanjing 211816, China.
  • Zhang J; College of Civil Engineering, Nanjing Tech University, Nanjing 211816, China.
  • Wang T; College of Civil Engineering, Nanjing Tech University, Nanjing 211816, China.
  • She J; College of Civil Engineering, Nanjing Tech University, Nanjing 211816, China.
  • Zhang T; College of Civil Engineering, Nanjing Tech University, Nanjing 211816, China.
Comput Intell Neurosci ; 2022: 6810649, 2022.
Article em En | MEDLINE | ID: mdl-35814533
ABSTRACT
The existing tower crane positioning layout mainly depends on the experience of construction personnel, and the best tower crane positioning can be found through a large number of manual data calculation. This manual method is time-consuming and impractical. In view of this, aiming at the current situation that building information modeling (BIM) software can only obtain the relative coordinates of components, this article puts forward the key technology of importing computer-aided design (CAD) graphics into geographic information system (GIS) software to automatically obtain the world coordinate information. By clarifying the transfer relationship between the component material supply point, the component initial positioning point, and the tower crane optional positioning point, as well as the cooperative relationship between each positioning point and the tower crane operation, the tower crane positioning optimization model is formed, and the firefly algorithm is used to automatically calculate and generate the best positioning layout method of the tower crane on the project site. In this study, the vertical transportation and positioning of components are studied, and intelligent construction is formed by integrating information technology. It can further enrich the functions of perception, analysis, decision-making, and optimization; realize the decision-making intelligence of industrial buildings; and achieve the organic unity of engineering construction execution system and decision-making command system.
Assuntos

Texto completo: 1 Base de dados: MEDLINE Assunto principal: Algoritmos / Software Idioma: En Ano de publicação: 2022 Tipo de documento: Article

Texto completo: 1 Base de dados: MEDLINE Assunto principal: Algoritmos / Software Idioma: En Ano de publicação: 2022 Tipo de documento: Article