1.
Sensors (Basel) ; 24(6)2024 Mar 09.
Artículo en Inglés | MEDLINE | ID: mdl-38544033

RESUMEN

In order to mitigate the risk of roof-dominated coal burst in underground coal mining, horizontal long borehole staged hydraulic fracturing technology has been prevailingly employed to facilitate the weakening treatment of the hard roof in advance. Such weakening effect, however, can hardly be evaluated, which leads to a lack of a basis in which to design the schemes and parameters of hydraulic fracturing. In this study, a combined underground-ground integrated microseismic monitoring and transient electromagnetic detection method was utilized to carry out simultaneous evaluations of the seismic responses to each staged fracturing and the apparent resistivity changes before and after all finished fracturing. On this basis, the comparable and applicable fracturing effects on coal burst prevention were evaluated and validated by the distribution of microseismic events and their energy magnitude during the mining process. Results show that the observed mining-induced seismic events are consistent with the evaluation results obtained from the combined seismic-electromagnetic detection method. However, there is a limited reduction effect on resistivity near the fractured section that induces far-field seismic events. Mining-induced seismic events are concentrated primarily within specific areas, while microseismic events in the fractured area exhibit high frequency but low energy overall. This study validates the rationality of combined seismic-electromagnetic detection results and provides valuable insights for optimizing fracturing construction schemes as well as comprehensively evaluating outcomes associated with underground directional long borehole staged hydraulic fracturing.

2.
Sensors (Basel) ; 23(4)2023 Feb 09.
Artículo en Inglés | MEDLINE | ID: mdl-36850547

RESUMEN

The current inverter is the core component of the helicopter transient electromagnetic (HTEM) detection system. It should meet the concerns of low loss, high power, and fast turn-OFF time. This article proposes a new circuit topology based on nine-level inverter technology to overcome the drawbacks of typical PWM (pulse width modulation) inverters, such as switching losses and harmonics. This circuit topology overcomes the shortcomings of the traditional single constant voltage clamp circuit in which the turn-OFF time is not adjustable. Using an inverter with the proposed topology is able to avoid the complex PWM control method and switching loss. In this way, the current rising edge and falling edge of this inverter are also improved effectively. The proposed inverter has adjustable turn-ON-time and turn-OFF time, which is significantly different from the conventional single-clamp inverter. Through subsequent experiments, the inverter proved to have the capability of generating trapezoidal current waveforms. Moreover, by modifying the FPGA (Field Programmable Gate Array) control program, three different turn-OFF times are achieved. The nine-level inverter has a peak current of 1.5 A with an adjustable turn-OFF time from 129 µs to 162 µs. Moreover, the switching frequency of the inverter is reduced from 10 kHz to below 100 Hz. The experimental results further demonstrate that it achieves lower switching losses and more flexible transmission. Our work in this article provides an efficient way to improve the performance of HTEM detection systems.