Energy potential and alternative usages of biogas and sludge from UASB reactors: case study of the Laboreaux wastewater treatment plant.
Rosa, A P; Conesa, J A; Fullana, A; Melo, G C B; Borges, J M; Chernicharo, C A L.
Afiliação
  • Rosa AP; Departamento de Química, Universidade Federal de Viçosa, Av. Peter Henry Rolfs s/n, Campus Universitário, Viçosa MG 36570-000, Brazil E-mail: andrerosa@ufv.br; andrerosa.p@gmail.com.
  • Conesa JA; Chemical Engineering Department, University of Alicante, PO Box 99, Alicante 03080, Spain.
  • Fullana A; Chemical Engineering Department, University of Alicante, PO Box 99, Alicante 03080, Spain.
  • Melo GC; Departamento de Engenharia Sanitária e Ambiental, Escola de Engenharia, Universidade Federal de Minas Gerais, Av. Antônio Carlos, 6.627-Campus Pampulha, Belo Horizonte, MG 31270-901, Brazil.
  • Borges JM; Serviço Autônomo de Água e Esgoto (SAAE), R. Nossa Sra. do Carmo, 148, Itabira, MG 35900-046, Brazil.
  • Chernicharo CA; Departamento de Engenharia Sanitária e Ambiental, Escola de Engenharia, Universidade Federal de Minas Gerais, Av. Antônio Carlos, 6.627-Campus Pampulha, Belo Horizonte, MG 31270-901, Brazil.
Water Sci Technol ; 73(7): 1680-90, 2016.
Article em En | MEDLINE | ID: mdl-27054741
ABSTRACT
This work assessed the energy potential and alternative usages of biogas and sludge generated in upflow anaerobic sludge blanket reactors at the Laboreaux sewage treatment plant (STP), Brazil. Two scenarios were considered (i) priority use of biogas for the thermal drying of dehydrated sludge and the use of the excess biogas for electricity generation in an ICE (internal combustion engine); and (ii) priority use of biogas for electricity generation and the use of the heat of the engine exhaust gases for the thermal drying of the sludge. Scenario 1 showed that the electricity generated is able to supply 22.2% of the STP power demand, but the thermal drying process enables a greater reduction or even elimination of the final volume of sludge to be disposed. In Scenario 2, the electricity generated is able to supply 57.6% of the STP power demand; however, the heat in the exhaust gases is not enough to dry the total amount of dehydrated sludge.
Assuntos

Texto completo: 1 Coleções: 01-internacional Base de dados: MEDLINE Assunto principal: Esgotos / Eliminação de Resíduos Líquidos / Reatores Biológicos / Biocombustíveis / Águas Residuárias / Gases País/Região como assunto: America do sul / Brasil Idioma: En Revista: Water Sci Technol Assunto da revista: SAUDE AMBIENTAL / TOXICOLOGIA Ano de publicação: 2016 Tipo de documento: Article

Texto completo: 1 Coleções: 01-internacional Base de dados: MEDLINE Assunto principal: Esgotos / Eliminação de Resíduos Líquidos / Reatores Biológicos / Biocombustíveis / Águas Residuárias / Gases País/Região como assunto: America do sul / Brasil Idioma: En Revista: Water Sci Technol Assunto da revista: SAUDE AMBIENTAL / TOXICOLOGIA Ano de publicação: 2016 Tipo de documento: Article