Environmental impact assessment of development projects improved by merging species distribution and habitat connectivity modelling.
Tarabon, Simon; Bergès, Laurent; Dutoit, Thierry; Isselin-Nondedeu, Francis.
Afiliação
  • Tarabon S; Soberco Environnement, Chemin du Taffignon 69630 Chaponost, France; Institut Méditerranéen de Biodiversité et Ecologie, UMR CNRS-IRD, Avignon Université, Aix-Marseille Université, IUT d'Avignon, 337 chemin des Meinajariés, Site Agroparc BP 61207, 84911 Avignon, cedex 09, France. Electronic address:
  • Bergès L; Université Grenoble Alpes, Irstea, UR LESSEM, 2, rue de la papeterie, BP 76, 38402 Saint-Martin-d'Hères Cedex, France.
  • Dutoit T; Institut Méditerranéen de Biodiversité et Ecologie, UMR CNRS-IRD, Avignon Université, Aix-Marseille Université, IUT d'Avignon, 337 chemin des Meinajariés, Site Agroparc BP 61207, 84911 Avignon, cedex 09, France.
  • Isselin-Nondedeu F; Institut Méditerranéen de Biodiversité et Ecologie, UMR CNRS-IRD, Avignon Université, Aix-Marseille Université, IUT d'Avignon, 337 chemin des Meinajariés, Site Agroparc BP 61207, 84911 Avignon, cedex 09, France; Département Aménagement et Environnement Ecole Polytechnique de l'Université de Tours, U
J Environ Manage ; 241: 439-449, 2019 Jul 01.
Article em En | MEDLINE | ID: mdl-30975576
Environmental impact assessment (EIA) is performed to limit potential impacts of development projects on species and ecosystem functions. However, the methods related to EIA actually pay little attention to the landscape-scale effects of development projects on biodiversity. In this study we proposed a methodological framework to more properly address the landscape-scale impacts of a new stadium project in Lyon (France) on two representative mammal species exemplary for the endemic fauna, the red squirrel and the Eurasian badger. Our approach combined species distribution model using Maxent and landscape functional connectivity model using Graphab at two spatial scales to assess habitat connectivity before and after development project implementation. The development project had a negative impact on landscape connectivity: overall habitat connectivity (PC index) decreased by -6.8% and -1.8% and the number of graph components increased by +60.0% and +17.6% for the red squirrel and the European badger respectively, because some links that formerly connected habitat patches were cut by the development project. Changes affecting landscape structure and composition emphasized the need to implement appropriate avoidance and reduction measures. Our methodology provides a useful tool both for EIA studies at each step of the way to support decision-making in landscape conservation planning. The method could be also developed in the design phase to compare the effectiveness of different avoidance or mitigation measures and resize them if necessary to maximize habitat connectivity.
Assuntos
Palavras-chave

Texto completo: 1 Coleções: 01-internacional Base de dados: MEDLINE Assunto principal: Ecossistema / Conservação dos Recursos Naturais Tipo de estudo: Prognostic_studies Limite: Animals País/Região como assunto: Europa Idioma: En Revista: J Environ Manage Ano de publicação: 2019 Tipo de documento: Article

Texto completo: 1 Coleções: 01-internacional Base de dados: MEDLINE Assunto principal: Ecossistema / Conservação dos Recursos Naturais Tipo de estudo: Prognostic_studies Limite: Animals País/Região como assunto: Europa Idioma: En Revista: J Environ Manage Ano de publicação: 2019 Tipo de documento: Article