Your browser doesn't support javascript.
loading
Control survey and analysis for the KEK e-/e+ injector linac.
Okayasu, Y; Suwada, T; Kakihara, K; Tanaka, M.
Afiliação
  • Okayasu Y; High Energy Accelerator Research Organization, 1-1 Oho, Tsukuba, Ibaraki 305-0801, Japan.
  • Suwada T; High Energy Accelerator Research Organization, 1-1 Oho, Tsukuba, Ibaraki 305-0801, Japan.
  • Kakihara K; High Energy Accelerator Research Organization, 1-1 Oho, Tsukuba, Ibaraki 305-0801, Japan.
  • Tanaka M; High Energy Accelerator Research Organization, 1-1 Oho, Tsukuba, Ibaraki 305-0801, Japan.
Rev Sci Instrum ; 94(7)2023 Jul 01.
Article em En | MEDLINE | ID: mdl-37477555
ABSTRACT
A control survey technique using a laser tracker and a digital level was introduced to the KEK e-/e+ injector linac in 2020. Control surveys are continuously demonstrated during the machine's downtimes every summer. Analysis of the two-year data reproduces their trends in terms of the fiducial points on the beam line. In our paper, we report on systematic coordinates and their error distributions evaluated by a control survey, compare them with a numerical survey simulation, and discuss newly encountered issues.

Texto completo: 1 Coleções: 01-internacional Base de dados: MEDLINE Idioma: En Revista: Rev Sci Instrum Ano de publicação: 2023 Tipo de documento: Article País de afiliação: Japão

Texto completo: 1 Coleções: 01-internacional Base de dados: MEDLINE Idioma: En Revista: Rev Sci Instrum Ano de publicação: 2023 Tipo de documento: Article País de afiliação: Japão