Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 4 de 4
Filtrar
Mais filtros











Base de dados
Intervalo de ano de publicação
1.
BMC Health Serv Res ; 19(1): 46, 2019 Jan 18.
Artigo em Inglês | MEDLINE | ID: mdl-30658625

RESUMO

BACKGROUND: Despite progress towards achieving UNAIDS 90-90-90 goals, barriers persist in laboratory systems in sub-Saharan Africa (SSA) restricting scale up of early infant diagnosis (EID) and viral load (VL) test monitoring of patients on antiretroviral therapy. If these facilities and system challenges persist, they may undermine recorded gains and appropriate management of patients. The aim of this review is to identify Public Private Partnerships (PPP) in SSA that have resolved systemic barriers within the VL and EID treatment cascade and demonstrated impact in the scale up of VL and EID. METHODS: We queried five HIV and TB laboratory databases from 2007 to 2017 for studies related to laboratory system strengthening and PPP. We identified, screened and included PPPs that demonstrated evidence in alleviating known system level barriers to scale up national VL and EID testing programs. PPPs that improved associated systems from the point of viral load test request to the use of the test result for patient management were deemed eligible. RESULTS: We identified six PPPs collaborations with multiple activities in select countries that are contributing to address challenges to scale up national viral load programs. One of the six PPPs reached 14.5 million patients in remote communities and transported up to 400,000 specimens in a year. Another PPP enabled an unprecedented 94% of specimens to reach national laboratory through improved sample referral network and enabled a cost savings of 62%. Also PPPs reduced cost of reagents and enabled 300,000 tested infants to be enrolled in care as well as reduced turnaround time of reporting results by 50%. CONCLUSIONS: Our review identified the benefits, enabling factors, and associated challenges for public and private sectors to engage in PPPs. PPP contributions to laboratory systems strengthening are a model and present opportunities that can be leveraged to strengthen systems to achieve the UNAIDS 90-90-90 treatment targets for HIV/AIDS. Despite growing emphasis on engaging the private sector as a critical partner to address global disease burden, PPPs that specifically strengthen laboratories, the cornerstone of public health programs, remain largely untapped.


Assuntos
Objetivos , Infecções por HIV/tratamento farmacológico , Parcerias Público-Privadas , United States Agency for International Development , África Subsaariana , Bases de Dados Factuais , Atenção à Saúde , Diagnóstico Precoce , HIV , Humanos , Lactente , Laboratórios , Testes Sorológicos , Estados Unidos , Carga Viral
2.
MMWR Morb Mortal Wkly Rep ; 65(46): 1285-1290, 2016 Nov 25.
Artigo em Inglês | MEDLINE | ID: mdl-27880749

RESUMO

Pediatric human immunodeficiency virus (HIV) infection remains an important public health issue in resource-limited settings. In 2015, 1.4 million children aged <15 years were estimated to be living with HIV (including 170,000 infants born in 2015), with the vast majority living in sub-Saharan Africa (1). In 2014, 150,000 children died from HIV-related causes worldwide (2). Access to timely HIV diagnosis and treatment for HIV-infected infants reduces HIV-associated mortality, which is approximately 50% by age 2 years without treatment (3). Since 2011, the annual number of HIV-infected children has declined by 50%. Despite this gain, in 2014, only 42% of HIV-exposed infants received a diagnostic test for HIV (2), and in 2015, only 51% of children living with HIV received antiretroviral therapy (1). Access to services for early infant diagnosis of HIV (which includes access to testing for HIV-exposed infants and clinical diagnosis of HIV-infected infants) is critical for reducing HIV-associated mortality in children aged <15 years. Using data collected from seven countries supported by the U.S. President's Emergency Plan for AIDS Relief (PEPFAR), progress in the provision of HIV testing services for early infant diagnosis was assessed. During 2011-2015, the total number of HIV diagnostic tests performed among HIV-exposed infants within 6 weeks after birth (tests for early infant diagnosis of HIV), as recommended by the World Health Organization (WHO) increased in all seven countries (Cote d'Ivoire, the Democratic Republic of the Congo, Haiti, Malawi, South Africa, Uganda, and Zambia); however, in 2015, the rate of testing for early infant diagnosis among HIV-exposed infants was <50% in five countries. HIV positivity among those tested declined in all seven countries, with three countries (Cote d'Ivoire, the Democratic Republic of the Congo, and Uganda) reporting >50% decline. The most common challenges for access to testing for early infant diagnosis included difficulties in specimen transport, long turnaround time between specimen collection and receipt of results, and limitations in supply chain management. Further reductions in HIV mortality in children can be achieved through continued expansion and improvement of services for early infant diagnosis in PEPFAR-supported countries, including initiatives targeted to reach HIV-exposed infants, ensure access to programs for early infant diagnosis of HIV, and facilitate prompt linkage to treatment for children diagnosed with HIV infection.


Assuntos
Diagnóstico Precoce , Infecções por HIV/diagnóstico , Programas de Rastreamento/estatística & dados numéricos , África Subsaariana , Região do Caribe , Feminino , Infecções por HIV/transmissão , Humanos , Lactente , Transmissão Vertical de Doenças Infecciosas , Gravidez
3.
J Infect Dis ; 213 Suppl 2: S41-6, 2016 Apr 15.
Artigo em Inglês | MEDLINE | ID: mdl-27025697

RESUMO

BACKGROUND: Diagnosis of multidrug-resistant tuberculosis and prompt initiation of effective treatment rely on access to rapid and reliable drug-susceptibility testing. Efficient specimen transport systems and appropriate training on specimen referral contribute to optimal and timely access to tuberculosis diagnostic services. METHODS: With support and technical assistance from a public-private partnership (PPP) between Becton Dickinson and the US President's Emergency Plan for AIDS Relief, the Uganda National TB Reference Laboratory (NTRL) and National TB and Leprosy Program redesigned the tuberculosis specimen transport network and trained healthcare workers with the goal of improving multidrug-resistant tuberculosis detection. RESULTS: Between 2008 and 2011, the PPP mapped 93% of health facilities and trained 724 healthcare and postal staff members covering 72% of districts. Strengthening the tuberculosis specimen referral system increased referrals from presumptive multidrug-resistant tuberculosis cases by >10-fold, with 94% of specimens reaching the NTRL within the established target transport time. CONCLUSIONS: This study demonstrates the potential of PPP collaborations with ministries of health to positively influence patient care by strengthening laboratory systems through increased access to drug-susceptibility testing in Uganda. Ongoing efforts to integrate specimen transport networks will maximize resources and improve patient management.


Assuntos
Instalações de Saúde , Laboratórios/organização & administração , Mycobacterium tuberculosis/isolamento & purificação , Parcerias Público-Privadas , Manejo de Espécimes , Tuberculose/diagnóstico , Atenção à Saúde/organização & administração , Pessoal de Saúde/educação , Necessidades e Demandas de Serviços de Saúde , Humanos , Laboratórios/normas , Testes de Sensibilidade Microbiana , Programas Nacionais de Saúde , Encaminhamento e Consulta , Tuberculose/microbiologia , Tuberculose Resistente a Múltiplos Medicamentos/diagnóstico , Tuberculose Resistente a Múltiplos Medicamentos/microbiologia , Uganda
4.
Am J Clin Pathol ; 131(6): 861-6, 2009 Jun.
Artigo em Inglês | MEDLINE | ID: mdl-19461095

RESUMO

The rapid scale-up of the care and treatment programs in Tanzania during the preceding 4 years has greatly increased the demand for quality laboratory services for diagnosis of HIV and monitoring patients during antiretroviral therapy. Laboratory services were not in a position to cope with this demand owing to poor infrastructure, lack of human resources, erratic and/or lack of reagent supply and commodities, and slow manual technologies. With the limited human resources in the laboratory and the need for scaling up the care and treatment program, it became necessary to install automated equipment and train personnel for the increased volume of testing and new tests across all laboratory levels. With the numerous partners procuring equipment, the possibility of a multitude of equipment platforms with attendant challenges for procurement of reagents, maintenance of equipment, and quality assurance arose. Tanzania, therefore, had to harmonize laboratory tests and standardize laboratory equipment at different levels of the laboratory network. The process of harmonization of tests and standardization of equipment included assessment of laboratories, review of guidelines, development of a national laboratory operational plan, and stakeholder advocacy. This document outlines this process.


Assuntos
Síndrome da Imunodeficiência Adquirida/diagnóstico , Técnicas de Laboratório Clínico/instrumentação , Técnicas de Laboratório Clínico/normas , Infecções por HIV/diagnóstico , Laboratórios/normas , Humanos , Programas Nacionais de Saúde , Guias de Prática Clínica como Assunto , Tanzânia
SELEÇÃO DE REFERÊNCIAS
DETALHE DA PESQUISA