Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 2 de 2
Filtrar
Adicionar filtros








Intervalo de ano
1.
China Medical Equipment ; (12): 51-53, 2015.
Artigo em Chinês | WPRIM | ID: wpr-474011

RESUMO

Objective:Through the construction of the Bank-Hospital connecting project, the enduring problems in clinic such as the long waiting time at registration, check out, payment, and other non-clinic issues are solved. Meanwhile, the clinic medication procedure is further regulated, which provides a faster medical assistance service for patients and elevates the ability to apply medical informationization.Methods:Based on the current HIS platform, the banking and mobile systems connected as a whole network and constructed the banking-medication platform. Results: The waiting time of patients is largely reduced by expanding the channels of registration, applying multiple cards as medication card, and introducing local charging, self-payment systems at every floor, and mobile intelligent platform.Conclusion: The Bank-Hospital connecting project brings convenience to patients and increases our efficiency.

2.
Artigo em Chinês | WPRIM | ID: wpr-517703

RESUMO

The paper expounds the connotation of HIS troubles, the methods for determining HIS troubles and the necessity of establishing a contingency plan for clearing such troubles. It also puts forward some specific measures for managing the contingency plan: ①defining the accountability and division of work in clearing various kinds of troubles; ②doing a good job of coordination in clearing troubles; ③carrying out strict training for the relevant personnel; and ④conducting checks and supervision all the time. Establishment of the plan makes it clear to HIS managers that enough attention ought to be paid to the prevention of troubles.

SELEÇÃO DE REFERÊNCIAS
DETALHE DA PESQUISA