Analysis of Performance of the MINItrace Cyclotron before and after Upgrade / 中国医疗器械杂志
Zhongguo Yi Liao Qi Xie Za Zhi
; (6): 92-94, 2020.
Article
ي Zh
| WPRIM
| ID: wpr-942706
المكتبة المسؤولة:
WPRO
ABSTRACT
OBJECTIVE@#To compare the performance of the GE cyclotron MINItrace system before and after the upgrade.@*METHODS@#The upgrade of the MINItrace system included replacing the silver target with the Nb syetem and adopting the latest RF control and management system and lastest ion source system.The failrue rate and production efficiency were retrospectively analyzed before and after the upgrade.@*RESULTS@#After the upgrade, the cyclotron failure rate decreased by 86.2%, the average capacity increased by 45%.@*CONCLUSIONS@#After the upgrade of MINItrace cyclotron, the failure rate is sharply reduced, and the production efficiency is grately improved.
Key words
النص الكامل:
1
الفهرس:
WPRIM
الموضوع الرئيسي:
Retrospective Studies
/
Cyclotrons
/
Equipment Failure
نوع الدراسة:
Observational_studies
اللغة:
Zh
مجلة:
Zhongguo Yi Liao Qi Xie Za Zhi
السنة:
2020
نوع:
Article