Achieving combined biological short-cut nitrogen and phosphorus removal in a one sludge system with side-stream sludge treatment.
Lu, Xuanyu; Duan, Haoran; Oehmen, Adrian; Carvalho, Gilda; Yuan, Zhiguo; Ye, Liu.
Afiliação
  • Lu X; Advanced Water Management Centre, The University of Queensland, St Lucia, QLD 4072, Australia; School of Chemical Engineering, The University of Queensland, St. Lucia, QLD 4072, Australia.
  • Duan H; Advanced Water Management Centre, The University of Queensland, St Lucia, QLD 4072, Australia; School of Chemical Engineering, The University of Queensland, St. Lucia, QLD 4072, Australia.
  • Oehmen A; School of Chemical Engineering, The University of Queensland, St. Lucia, QLD 4072, Australia.
  • Carvalho G; Advanced Water Management Centre, The University of Queensland, St Lucia, QLD 4072, Australia.
  • Yuan Z; Advanced Water Management Centre, The University of Queensland, St Lucia, QLD 4072, Australia.
  • Ye L; School of Chemical Engineering, The University of Queensland, St. Lucia, QLD 4072, Australia. Electronic address: l.ye@uq.edu.au.
Water Res ; 203: 117563, 2021 Sep 15.
Article em En | MEDLINE | ID: mdl-34419918
ABSTRACT
Biological nitrogen (N) removal via the short-cut pathway (NH4+-N→NO2--N→N2) is economically attractive in wastewater treatment plants (WWTPs). However, biological phosphorus (P) removal processes remain a bottleneck in these systems due to the strong inhibitory effect of nitrite or its protonated form (HNO2, free nitrous acid - FNA) on polyphosphate accumulating organisms (PAOs). In this study, a novel combined nitrogen and phosphorus removal strategy was verified and achieved in a biological short-cut nitrogen removal system via side-stream sludge treatment with FNA, and the mechanisms impacting this process were investigated. The side-stream FNA treatment process applied here led to a significant reduction in the real sludge retention time (SRT) in the mainstream (approximately 2.7 days) based on the biocidal effect of FNA to the majority of the organisms. This work also found that around 40% of the P uptake activity was still maintained at a much higher FNA level of 38 µg N/L with potential PAOs, which highly broadened the current knowledge of PAOs community. An economic analysis revealed advantages of the proposed as compared to conventional biological nitrogen and phosphorus removal (13% savings in total cost), biological short-cut nitrogen removal (via FNA treatment) with chemical phosphorus precipitation (21% savings) and conventional biological nitrogen removal with chemical precipitation (27% savings). Overall, this study presents a novel and viable retrofit strategy in integrating biological short-cut nitrogen removal with EBPR for next generation WWTPs.
Assuntos
Palavras-chave

Texto completo: 1 Base de dados: MEDLINE Assunto principal: Fósforo / Esgotos Idioma: En Revista: Water Res Ano de publicação: 2021 Tipo de documento: Article País de afiliação: Austrália