Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 13 de 13
Filtrar
1.
BMJ Open Qual ; 13(1)2024 02 26.
Artículo en Inglés | MEDLINE | ID: mdl-38413093

RESUMEN

INTRODUCTION: Standards to define and measure quality in healthcare for cardiovascular disease risk reduction and secondary prevention are available, but there is a paucity of indicators that could serve as facilitators of structural change at a system level. This research study aimed to develop a range of delivery indicators to help cardiac clinical networks assess delivery of and progress towards cardiovascular disease objectives. METHODS: This study used an adapted version of the European Society of Cardiology's four-step process for the development of quality indicators. The four steps in this study were as follows: identify critical factors of enablement, construct a list of candidate indicators, select a final set of indicators and assess availability of national data for each indicator. In this iterative process, a core project group of six members was supported by a wider review group of 21 people from the National Health Service (NHS) clinical and management personnel database. RESULTS: The core project group identified six relevant cardiovascular disease priorities in the NHS Long Term Plan and used an iterative process to identify 21 critical factors that impact on their implementation. A total of 57 potential indicators that could be measures of implementation were developed. The core project group agreed on a set of 38 candidate indicators that were circulated to the review group for rating. Based on these scores, the core project group excluded 5 indicators to arrive at a final set of 33 delivery indicators. National datasets were available for 22 of the final indicators, which were designated as delivery indicators. The remaining 11, for which national datasets were not available but locally available datasets could be used, were designated as delivery enablers. CONCLUSION: The suite of delivery indicators and delivery enablers for cardiovascular disease could allow a more focused evaluation of factors that impact on delivery of healthcare for cardiovascular disease.


Asunto(s)
Enfermedades Cardiovasculares , Humanos , Enfermedades Cardiovasculares/prevención & control , Indicadores de Calidad de la Atención de Salud , Técnica Delphi , Medicina Estatal , Reino Unido
2.
Open Heart ; 9(1)2022 01.
Artículo en Inglés | MEDLINE | ID: mdl-35082136

RESUMEN

OBJECTIVE: To estimate the population prevalence and treatable burden of severe aortic stenosis (AS) in the UK. METHODS: We adapted a contemporary model of the population profile of symptomatic and asymptomatic severe AS in Europe and North America to estimate the number of people aged ≥55 years in the UK who might benefit from surgical aortic valve replacement (SAVR) or transcatheter aortic valve implantation (TAVI). RESULTS: With a point prevalence of 1.48%, we estimate that 291 448 men and women aged ≥55 years in the UK had severe AS in 2019. Of these, 68.3% (199 059, 95% CI 1 77 201 to 221 355 people) would have been symptomatic and, therefore, more readily treated according to their surgical risk profile; the remaining 31.7% of cases (92 389, 95% CI 70 093 to 144 247) being asymptomatic. Based on historical patterns of intervention, 58.4% (116 251, 95% CI 106 895 to 1 25 606) of the 199 059 symptomatic cases would qualify for SAVR, with 7208 (95% CI 7091 to 7234) being assessed as being in a high, preoperative surgical risk category. Among the remaining 41.6% (82 809, 95% CI 73 453 to 92 164) of cases potentially unsuitable for SAVR, an estimated 61.7% (51 093, 95% CI 34 780 to 67 655) might be suitable for TAVI. We estimate that 172 859 out of 291 448 prevalent cases of severe AS (59.3%) will subsequently die within 5 years without proactive management. CONCLUSIONS: These data suggest a high burden of severe AS in the UK requiring surgical or transcatheter intervention that challenges the ongoing capacity of the National Health Service to meet the needs of those affected.


Asunto(s)
Estenosis de la Válvula Aórtica/cirugía , Válvula Aórtica/cirugía , Costos de la Atención en Salud/tendencias , Prótesis Valvulares Cardíacas , Medicina Estatal/economía , Reemplazo de la Válvula Aórtica Transcatéter/economía , Anciano , Estenosis de la Válvula Aórtica/economía , Estenosis de la Válvula Aórtica/epidemiología , Femenino , Humanos , Masculino , Morbilidad/tendencias , Factores de Riesgo , Índice de Severidad de la Enfermedad , Tasa de Supervivencia/tendencias , Reino Unido/epidemiología
3.
Heart ; 103(2): 117-124, 2017 01 15.
Artículo en Inglés | MEDLINE | ID: mdl-27411838

RESUMEN

OBJECTIVE: Studies reporting an association between treatment delay and outcome for patients with ST segment elevation myocardial infarction (STEMI) have generally not included patients treated by a primary percutaneous coronary intervention (PPCI) service that systematically delivers reperfusion therapy to all eligible patients. We set out to determine the association of call-to-balloon (CTB) time with 30-day mortality after PPCI in a contemporary series of patients treated within a national reperfusion service. METHODS: We analysed data on 16 907 consecutive patients with STEMI treated by PPCI in England and Wales in 2011 with CTB time of ≤6 hours. RESULTS: The median CTB and door-to-balloon times were 111 and 41 min, respectively, with 80.9% of patients treated within 150 min of the call for help. An out-of-hours call time (58.2% of patients) was associated with a 10 min increase in CTB time, whereas inter-hospital transfer for PPCI (18.5% of patients) was associated with a 49 min increase in CTB time. CTB time was independently associated with 30-day mortality (p<0.0001) with a HR of 1.95 (95% CI 1.54 to 2.47) for a CTB time of >180-240 min compared with ≤90 min. The relationship between CTB time and 30-day mortality was influenced by patient risk profile with a greater absolute impact of increasing CTB time on mortality in high-risk patients. CONCLUSION: CTB time is a useful metric to assess the overall performance of a PPCI service. Delays to reperfusion remain important even in the era of organised national PPCI services with rapid treatment times and efforts should continue to minimise treatment delays.


Asunto(s)
Angioplastia Coronaria con Balón/normas , Infarto del Miocardio con Elevación del ST/terapia , Distribución por Edad , Anciano , Anciano de 80 o más Años , Angioplastia Coronaria con Balón/mortalidad , Angioplastia Coronaria con Balón/estadística & datos numéricos , Prestación Integrada de Atención de Salud/organización & administración , Inglaterra/epidemiología , Femenino , Humanos , Estimación de Kaplan-Meier , Masculino , Persona de Mediana Edad , Factores de Riesgo , Infarto del Miocardio con Elevación del ST/mortalidad , Prevención Secundaria/organización & administración , Distribución por Sexo , Medicina Estatal/organización & administración , Factores de Tiempo , Gales/epidemiología
4.
EuroIntervention ; 10 Suppl T: T96-T104, 2014 Aug.
Artículo en Inglés | MEDLINE | ID: mdl-25256542

RESUMEN

The UK had previously established a comprehensive strategy for in-hospital nurse-led thrombolysis for patients with ST-elevation myocardial infarction, with a growing use of pre-hospital thrombolysis by paramedical staff in the ambulance services. The National Infarct Angioplasty Project was sponsored by the government and examined the introduction of primary percutaneous coronary angioplasty (PPCI) in a variety of urban, rural and mixed communities. The project found that PPCI could be delivered within acceptable timelines, would be cost-effective, and could be delivered to the majority of the population. A project was therefore undertaken in England to transform services. There has been a rapid change and by 2012/13 over 95% of eligible patients received PPCI. Survival of patients with STEMI has improved over time and length of stay in hospital halved. However, nearly a quarter of STEMI patients do not receive reperfusion therapy (often because of late presentation) and additional work is needed to minimise delays to treatment. There are unexplained differences between regions in numbers of PPCI procedures per million population, and there is also variance between centres in the proportion of patients who are in shock or on a ventilator. Additional research is needed to ensure a consistent approach for these sick patients, who might have the most to gain from early treatment. The national audit programmes have been instrumental in measuring the changes in strategies, monitoring performance and highlighting the associated improvements in outcomes. A new risk model is being developed to allow a more comprehensive comparison of outcomes in different hospitals.


Asunto(s)
Angioplastia Coronaria con Balón , Mortalidad Hospitalaria , Infarto del Miocardio/terapia , Intervención Coronaria Percutánea , Angioplastia Coronaria con Balón/métodos , Inglaterra , Humanos , Intervención Coronaria Percutánea/métodos , Terapia Trombolítica/métodos , Resultado del Tratamiento
5.
Heart ; 100(8): 619-23, 2014 Apr.
Artículo en Inglés | MEDLINE | ID: mdl-24553390

RESUMEN

INTRODUCTION: Public access defibrillation (PAD) prior to ambulance arrival is a key determinant of survival from out-of-hospital (OOH) cardiac arrest. Implementation of PAD has been underway in the UK for the past 12 years, and its importance in strengthening the chain of survival has been recognised in the government's recent 'Cardiovascular Disease Outcomes Strategy'. The extent of use of PAD in OOH cardiac arrests in the UK is unknown. We surveyed all OOH cardiac arrests in Hampshire over a 12-month period to ascertain the availability and effective use of PAD. METHODS: A retrospective review of all patients with OOH cardiac arrest attended by South Central Ambulance Service (SCAS) in Hampshire during a 1-year period (1 September 2011 to 31 August 2012) was undertaken. Emergency calls were reviewed to establish the known presence of a PAD. Additionally, a review of all known PAD locations in Hampshire was undertaken, together with a survey of public areas where a PAD may be expected to be located. RESULTS: The current population of Hampshire is estimated to be 1.76 million. During the study period, 673 known PADs were located in 278 Hampshire locations. Of all calls confirmed as cardiac arrest (n=1035), the caller reported access to an automated external defibrillator (AED) on 44 occasions (4.25%), successfully retrieving and using the AED before arrival of the ambulance on only 18 occasions (1.74%). CONCLUSIONS: Despite several campaigns to raise public awareness and make PADs more available, many public areas have no recorded AED available, and in those where an AED was available it was only used in a minority of cases by members of the public before arrival of the ambulance. Overall, a PAD was only deployed successfully in 1.74% OOH cardiac arrests. This weak link in the chain of survival contributes to the poor survival rate from OOH cardiac arrest and needs strengthening.


Asunto(s)
Desfibriladores , Accesibilidad a los Servicios de Salud , Paro Cardíaco Extrahospitalario/terapia , Salud Pública , Cardioversión Eléctrica/efectos adversos , Cardioversión Eléctrica/instrumentación , Cardioversión Eléctrica/mortalidad , Servicios Médicos de Urgencia , Inglaterra , Encuestas de Atención de la Salud , Conocimientos, Actitudes y Práctica en Salud , Promoción de la Salud , Necesidades y Demandas de Servicios de Salud , Humanos , Paro Cardíaco Extrahospitalario/mortalidad , Estudios Retrospectivos , Análisis de Supervivencia , Tasa de Supervivencia , Factores de Tiempo , Resultado del Tratamiento
7.
EuroIntervention ; 8 Suppl P: P62-70, 2012 Aug.
Artículo en Inglés | MEDLINE | ID: mdl-22917794

RESUMEN

Although clinical trials have demonstrated that primary percutaneous coronary intervention (PPCI) provides better outcomes than thrombolysis for STEMI, it cannot be assumed that similar results can be obtained in day-to-day practice. To determine whether standards are being met, continuous audit of PPCI programmes is necessary, with appropriate feedback to participating centres and operators. Both the MINAP and BCIS national audit projects allow central electronic collection of data on consecutive patients presenting to every hospital involved in the acute management of these patients. Regular programmed feedback is provided to centres performing primary PCI that attempts to take account of statistical variation and differences in case mix between units by making use of funnel plots, statistical process control graphs and risk adjustment models. This reporting of "process" and "outcome" data, both confidentially and within the public domain, has been used to drive up clinical performance and has been associated with steady improvements and reduced inequalities of care.


Asunto(s)
Síndrome Coronario Agudo/terapia , Angioplastia Coronaria con Balón/normas , Auditoría Médica , Infarto del Miocardio/terapia , Evaluación de Procesos y Resultados en Atención de Salud/normas , Mejoramiento de la Calidad/normas , Indicadores de Calidad de la Atención de Salud/normas , Medicina Estatal/normas , Síndrome Coronario Agudo/diagnóstico , Angioplastia Coronaria con Balón/efectos adversos , Angioplastia Coronaria con Balón/mortalidad , Benchmarking/normas , Disparidades en Atención de Salud/normas , Humanos , Infarto del Miocardio/diagnóstico , Desarrollo de Programa , Evaluación de Programas y Proyectos de Salud , Resultado del Tratamiento , Reino Unido
8.
EuroIntervention ; 8 Suppl P: P99-107, 2012 Aug.
Artículo en Inglés | MEDLINE | ID: mdl-22917802

RESUMEN

In 2004 in the United Kingdom (UK), the infrastructural and organisational changes required for implementation of primary PCI for treatment of STEMI were unclear, and the cost-effectiveness and sustainability of a changed reperfusion strategy had not been tested. In addition, any proposed change was to be made against the background of a previously successful in-hospital thrombolysis strategy, with plans for greater use of pre-hospital administration. A prospective study (the "National Infarct Angioplasty Project - NIAP") was set up to collect information on all patients presenting with STEMI in selected regions in the UK over a one year period (April 2005 - March 2006). The key findings from the NIAP project included that PPCI could be delivered within acceptable treatment times in a variety of geographical settings and that the shortest treatment times were achieved with direct admission to a PPCI-capable cardiac catheter laboratory. The transformation from a dominant lytic strategy to one of PPCI across the UK was achieved both swiftly and consistently with the help of 28 cardiac networks. By the second quarter of 2011, 94% of those STEMI patients in England who received reperfusion treatment were being treated by PPCI compared with 46% during the third quarter of 2008.


Asunto(s)
Prestación Integrada de Atención de Salud/organización & administración , Accesibilidad a los Servicios de Salud/organización & administración , Planificación Hospitalaria/organización & administración , Infarto del Miocardio/terapia , Intervención Coronaria Percutánea , Medicina Estatal/organización & administración , Prestación Integrada de Atención de Salud/normas , Política de Salud , Promoción de la Salud , Accesibilidad a los Servicios de Salud/normas , Planificación Hospitalaria/normas , Humanos , Modelos Organizacionales , Infarto del Miocardio/diagnóstico , Objetivos Organizacionales , Intervención Coronaria Percutánea/normas , Formulación de Políticas , Guías de Práctica Clínica como Asunto , Desarrollo de Programa , Evaluación de Programas y Proyectos de Salud , Mejoramiento de la Calidad/organización & administración , Indicadores de Calidad de la Atención de Salud/organización & administración , Sistema de Registros , Medicina Estatal/normas , Terapia Trombolítica , Factores de Tiempo , Tiempo de Tratamiento/organización & administración , Resultado del Tratamiento , Reino Unido
SELECCIÓN DE REFERENCIAS
DETALLE DE LA BÚSQUEDA