Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 2 de 2
Filtrar
Más filtros










Base de datos
Intervalo de año de publicación
1.
Artículo en Inglés | MEDLINE | ID: mdl-33445634

RESUMEN

Many cities have encountered challenges associated with rapid urban development, population growth and aging, in which urban renewal has become a promising option. Different renewal strategies, such as redevelopment, refurbishment and conservation, not only contributes to quality improvement and energy consumption reduction of dilapidated urban area, but also to greenhouse gas (GHG) emissions mitigation. Such integrated benefits are often termed as co-benefits. However, choosing the most co-benefits strategy to adopt requires a holistic understanding of social-economic and environmental aspects, which has been less reported in the existing literature. Under such circumstance, this article aims to shed light on the co-benefits of different renewal strategies by adopting the Emergy-Life cycle assessment method. Then, the method is applied to one case study of the refurbishment of an educational building located in Chongqing, China. Resource allocation, CO2 emissions and emergy-based indicators are calculated to assess the co-benefits during a 60-year research period, to compare the impacts of the complete demolition followed by a new one (rebuilding strategy) and the refurbishing of the existing building (refurbishment strategy). The case study shows that the annual emergy in the O&M phase of rebuilding strategy and refurbishment strategy were lower than existing building. Rebuilding and refurbishment strategies released approximately 59.1% and 80.6%, respectively, of the total CO2 emissions that would be produced by the existing building. The results reveal that substantial environmental benefits can be obtained in both the refurbishment and rebuilding strategies. On the other hand, it can be concluded that the emergy yield ratio (EYR) for the rebuilding strategy is higher than refurbishment strategy, which demonstrate the better performance of refurbishment considering that less resources are required to generate greater benefits. In addition, the value of environmental loading ratio (ELR) and emergy sustainability index (ESI) also suggests that the refurbishment strategy performs better from the perspective of the environment. Thereby, the refurbishment strategy is more suitable than the rebuilding strategy. Findings from this study can be useful to urban planners and decision-makers in choosing the most suitable strategy to improve the quality of existing buildings.


Asunto(s)
Gases de Efecto Invernadero , China , Ciudades , Conservación de los Recursos Naturales , Remodelación Urbana
2.
Artículo en Inglés | MEDLINE | ID: mdl-33202770

RESUMEN

Industrialization has been widely regarded as a sustainable construction method in terms of its environmental friendliness. However, existing studies mainly consider the single impact of greenhouse gas emissions or material consumption in the construction process of industrialized buildings, and pay less attention to ecological pollution and community interest, which leads to an insufficient understanding. There is an urgent need to systematically carry out accurate assessment of comprehensive construction environmental impact within industrialized building processes. Various methods, including face-to-face interviews, field research and building information modeling (BIM), were used for data collection. Four categories selected for the study included resource consumption, material loss, ecological pollution, and community interest. A life cycle assessment (LCA) model, namely input-process-output model (IPO), is proposed to analyze the construction environmental impact of the standard layer of industrialized buildings from four life cycle stages, namely, transportation, stacking, assembly and cast-in-place. The monetization approach of willingness to pay (WTP) was applied to make a quantitative comparison. Results reveal that the assembly stage has the largest impact on the environment at 66.13% among the four life cycle stages, followed by transportation at 16.39%, stacking at 10.29%, and cast-in-place at 7.19%. The key factors include power consumption, noise pollution, material loss, fuel consumption and component loss, which altogether account for more than 85% of the total impact. Relevant stakeholders can conduct their project using the same approach to determine the construction environmental performance and hence introduce appropriate measures to mitigate the environmental burden.


Asunto(s)
Industria de la Construcción , Ambiente , Contaminación Ambiental , Desarrollo Industrial , Modelos Teóricos , Industria de la Construcción/educación , Industria de la Construcción/normas , Industria de la Construcción/estadística & datos numéricos , Materiales de Construcción , Contaminación Ambiental/estadística & datos numéricos , Gases de Efecto Invernadero , Desarrollo Industrial/estadística & datos numéricos , Transportes
SELECCIÓN DE REFERENCIAS
DETALLE DE LA BÚSQUEDA
...