Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 3 de 3
Filtrar
Más filtros










Base de datos
Intervalo de año de publicación
1.
Prehosp Disaster Med ; 37(S1): s16-s29, 2022 Feb.
Artículo en Inglés | MEDLINE | ID: mdl-35253638

RESUMEN

OBJECTIVE: This paper aims to clarify how the Project for Strengthening the ASEAN Regional Capacity on Disaster Health Management (ARCH Project) strengthened regional collaboration mechanisms on disaster health management (DHM) in ASEAN. METHODS: The political process and the relevant documents of the ARCH Project were reviewed. RESULTS: The ARCH Project established the Regional Coordination Committee as a coordination platform for providing strategic direction to the project and strengthening the regional coordination of DHM. Also, the Project Working Groups and Sub-Working Groups were set up as implementation bodies for the project activities with representatives of ASEAN Member States (AMS). With support from DHM experts of Japan and Thailand, a series of discussions were conducted for the development of a Standard Operating Procedure (SOP) for the Coordination of International Emergency Medical Teams (I-EMTs), regional tools, and collective measures supporting AMS to overcome challenges, and thereby meeting the minimum requirements set by the WHO EMT Initiative. The progress and outputs of the ARCH Project are subsequently elevated to the ASEAN Health Sector for endorsement, the updates are further shared to the Joint Task Force to Promote Synergy with Other Relevant ASEAN Bodies on Humanitarian Assistance and Disaster Relief (JTF-HADR) for the implementation of the ASEAN Declaration on One ASEAN One Response. The initiation of the ARCH Project in July 2016 has resulted in the development of the ASEAN regional collaboration framework, including the establishment of the Regional Coordination Committee on Disaster Health Management (RCCDHM), the SOP for ASEAN I-EMT coordination, and regional tools, such as forms for Medical Record for Emergency and Disaster and Health Needs Assessment. Moreover, further discussions on ASEAN Collective Measures that aim to support AMS to meet the WHO EMT minimum standards and strengthening I-EMT coordination capacity were also conducted. As adopted by the ASEAN Health Ministers Meeting (AHMM) in 2019, the RCCDHM was established as one of the mechanisms to operationalize the Plan of Action to implement the ASEAN Leaders' Declaration on DHM. CONCLUSION: The contribution of the ARCH Project to strengthen the ASEAN regional capacity in DHM has enhanced the regional coordination platform, with a formalization of RCCDHM as ASEAN's official regional mechanism, and of the on-going integration process of the SOP for EMT coordination into the ASEAN SASOP.


Asunto(s)
Planificación en Desastres , Desastres , Humanos , Japón , Política , Tailandia
2.
Disaster Med Public Health Prep ; 15(3): 308-315, 2021 06.
Artículo en Inglés | MEDLINE | ID: mdl-32172718

RESUMEN

OBJECTIVES: After the Nepal earthquake in 2015, for the first time, the Emergency Medical Team Coordination Cell (EMTCC) was activated. This study aims to evaluate the emergency medical team (EMT) coordination in the aftermath of the Nepal earthquake in 2015. METHODS: This is a retrospective study that (a) describes the coordination process in Nepal, and (b) reviews and analyzes the EMT database in Nepal to classify the EMTs based on the World Health Organization (WHO) EMT classification, an online survey for EMT coordination, and the Geographic Information System-analyzed EMT distribution. RESULTS: We recorded 150 EMTs, which included 29 Type 1-Mobile, 71 Type 1-Fixed, 22 Type 2, 1 Type 3, and 27 specialist cell recorded EMTs including the military team. The EMTs were allocated based on the number of casualties in that area. The Type 1 EMTs were deployed around Type 2 EMTs. CONCLUSIONS: The EMT Classification is useful for the effective posting of EMTs. However, the method of onsite multi registration has room for improvement. The WHO should provide an opportunity for EMTCC training for better coordination of disasters.


Asunto(s)
Desastres , Terremotos , Urgencias Médicas , Humanos , Nepal , Estudios Retrospectivos
3.
Prehosp Disaster Med ; 35(2): 160-164, 2020 Apr.
Artículo en Inglés | MEDLINE | ID: mdl-32054562

RESUMEN

INTRODUCTION: The Nankai Trough, which marks the boundary between the Eurasian and Philippine Sea plates, is forecasted to create a catastrophic earthquake and tsunami within 30 years. The Japanese government believes that the number of casualties would be huge. However, the exact number of severely injured (SI) people who would need emergency and intensive care has not been identified. OBJECTIVE: This study, therefore, aimed to clarify the gap between medical supplies and forecasted demand. METHODS: The official data estimating the number of injured people were collected, together with the number of intensive care unit (ICU) and high care unit (HCU) beds from each prefecture throughout Japan. The number of SI cases was recalculated based on official data. The number of hospital beds was then compared with the number of SI people. RESULTS: The total number of hospitals in Japan is 8,493 with 893,970 beds, including 6,556 ICU and 5,248 HCU beds. When the Nankai Trough earthquake occurs, 187 of the 723 disaster base hospitals (DBHs) would be located in the areas with a seismic intensity of an upper six on the Japanese Seismic Intensity Scale (JSIS) of seven, and 79 DBHs would be located in the tsunami inundation area. The estimated total number of injured people would be 661,604, including 26,857 severe, 290,065 moderate, and 344,682 minor cases. CONCLUSION: Even if all ICU and HCU beds were available for severe patients, an additional 15,053 beds would be needed. If 80% of beds were used in non-disaster times, the available ICU and HCU beds would be only 2,361. The Cabinet Office of Japan (Chiyoda City, Tokyo, Japan) assumes that 60% of hospital beds would be unavailable in an area with an upper six on the JSIS. The number of ICU and HCU beds that would be usable during a disaster would thus further decrease. The beds needed for severe patients, therefore, would be significantly lacking when the Nankai Trough earthquake occurs. It would be necessary to start the treatment of those severe patients who are "more likely to be saved."


Asunto(s)
Planificación en Desastres , Terremotos , Servicio de Urgencia en Hospital/estadística & datos numéricos , Equipos y Suministros de Hospitales/estadística & datos numéricos , Tsunamis , Humanos , Japón
SELECCIÓN DE REFERENCIAS
DETALLE DE LA BÚSQUEDA