Your browser doesn't support javascript.
loading
Show: 20 | 50 | 100
Results 1 - 10 de 10
Filter
Add more filters











Publication year range
1.
Rev Sci Instrum ; 91(2): 023510, 2020 Feb 01.
Article in English | MEDLINE | ID: mdl-32113382

ABSTRACT

The requirements of ITER neutral beam injectors (1 MeV, 40 A negative deuterium ion current for 1 h) have never been simultaneously attained; therefore, a dedicated Neutral Beam Test Facility (NBTF) was set up at Consorzio RFX (Padova, Italy). The NBTF includes two experiments: SPIDER (Source for the Production of Ions of Deuterium Extracted from Rf plasma), the full-scale prototype of the source of ITER injectors, with a 100 keV accelerator, to investigate and optimize the properties of the ion source; and MITICA, the full-scale prototype of the entire injector, devoted to the issues related to the accelerator, including voltage holding at low gas pressure. The present paper gives an account of the status of the procurements, of the timeline, and of the voltage holding tests and experiments for MITICA. As for SPIDER, the first year of operation is described, regarding the solution of some issues connected with the radiofrequency power, the source operation, and the characterization of the first negative ion beam.

2.
Rev Sci Instrum ; 87(2): 02B141, 2016 Feb.
Article in English | MEDLINE | ID: mdl-26932023

ABSTRACT

SPIDER (Source for Production of Ions of Deuterium Extracted from a Rf plasma) is an ion source test bed designed to extract and accelerate a negative ion current up to 40 A and 100 kV whose first beam is expected by the end of 2016. Two main effects perturb beamlet optics during the acceleration stage: space charge repulsion and the deflection induced by the permanent magnets (called co-extracted electron suppression magnets) embedded in the EG. The purpose of this work is to evaluate and compare benefits, collateral effects, and limitations of electrical and magnetic compensation methods for beamlet deflection. The study of these methods has been carried out by means of numerical modeling tools: multi-beamlet simulations have been performed for the first time.

3.
Rev Sci Instrum ; 87(2): 02B309, 2016 Feb.
Article in English | MEDLINE | ID: mdl-26932037

ABSTRACT

The megavolt ITER injector and concept advancement experiment is the prototype and the test bed of the ITER heating and current drive neutral beam injectors, currently in the final design phase, in view of the installation in Padova Research on Injector Megavolt Accelerated facility in Padova, Italy. The beam source is the key component of the system, as its goal is the generation of the 1 MeV accelerated beam of deuterium or hydrogen negative ions. This paper presents the highlights of the latest developments for the finalization of the MITICA beam source design, together with a description of the most recent analyses and R&D activities carried out in support of the design.

4.
Rev Sci Instrum ; 87(2): 02B325, 2016 Feb.
Article in English | MEDLINE | ID: mdl-26932053

ABSTRACT

A scheme of a neutral beam injector (NBI), based on electrostatic acceleration and magneto-static deflection of negative ions, is proposed and analyzed in terms of feasibility and performance. The scheme is based on the deflection of a high energy (2 MeV) and high current (some tens of amperes) negative ion beam by a large magnetic deflector placed between the Beam Source (BS) and the neutralizer. This scheme has the potential of solving two key issues, which at present limit the applicability of a NBI to a fusion reactor: the maximum achievable acceleration voltage and the direct exposure of the BS to the flux of neutrons and radiation coming from the fusion reactor. In order to solve these two issues, a magnetic deflector is proposed to screen the BS from direct exposure to radiation and neutrons so that the voltage insulation between the electrostatic accelerator and the grounded vessel can be enhanced by using compressed SF6 instead of vacuum so that the negative ions can be accelerated at energies higher than 1 MeV. By solving the beam transport with different magnetic deflector properties, an optimum scheme has been found which is shown to be effective to guarantee both the steering effect and the beam aiming.

5.
Rev Sci Instrum ; 87(2): 02B927, 2016 Feb.
Article in English | MEDLINE | ID: mdl-26932099

ABSTRACT

In view of the realization of the negative ion beam injectors for ITER, a test facility, named SPIDER, is under construction in Padova (Italy) to study and optimize production and extraction of negative ions. The present paper is devoted to the analysis of the expected first operations of SPIDER in terms of single-beamlet and multiple-beamlet simulations of the hydrogen beam optics in various operational conditions. The effectiveness of the methods adopted to compensate for the magnetic deflection of the particles is also assessed. Indications for a sequence of the experimental activities are obtained.

6.
Rev Sci Instrum ; 85(2): 02A736, 2014 Feb.
Article in English | MEDLINE | ID: mdl-24593470

ABSTRACT

The Source for Production of Ion of Deuterium Extracted from Rf plasma (SPIDER) test facility is under construction in Padova to optimise the operation of the beam source of ITER neutral beam injectors. The SPIDER beam will be characterised by the instrumented calorimeter STRIKE, whose main components are one-directional carbon-fibre-carbon-composite tiles. A small-scale version of the entire system has been employed in the BAvarian Test MAchine for Negative ions (BATMAN) testbed by arranging two prototype tiles in the vertical direction. The paper presents a description of the mini-STRIKE system and of the data analysis procedures, as well as some results concerning the BATMAN beam under varying operating conditions.

7.
Rev Sci Instrum ; 85(2): 02B128, 2014 Feb.
Article in English | MEDLINE | ID: mdl-24593568

ABSTRACT

Two Neutral Beam Injectors (NBI) are foreseen to provide a substantial fraction of the heating power necessary to ignite thermonuclear fusion reactions in ITER. The development of the NBI system at unprecedented parameters (40 A of negative ion current accelerated up to 1 MV) requires the realization of a full scale prototype, to be tested and optimized at the Test Facility under construction in Padova (Italy). The beam source is the key component of the system and the design of the multi-grid accelerator is the goal of a multi-national collaborative effort. In particular, beam steering is a challenging aspect, being a tradeoff between requirements of the optics and real grids with finite thickness and thermo-mechanical constraints due to the cooling needs and the presence of permanent magnets. In the paper, a review of the accelerator physics and an overview of the whole R&D physics program aimed to the development of the injector source are presented.

8.
Rev Sci Instrum ; 85(2): 02B317, 2014 Feb.
Article in English | MEDLINE | ID: mdl-24593594

ABSTRACT

A new magnetic configuration is proposed for the suppression of co-extracted electrons in a negative-ion accelerator. This configuration is produced by an arrangement of permanent magnets embedded in one accelerator grid and creates an asymmetric local magnetic field on the upstream and downstream sides of this grid. Thanks to the "concentration" of the magnetic field on the upstream side of the grid, the resulting deflection of the ions due to magnetic field can be "intrinsically" cancelled by calibrating the configuration of permanent magnets. At the same time, the suppression of co-extracted electrons can be improved.

9.
Rev Sci Instrum ; 83(2): 02B107, 2012 Feb.
Article in English | MEDLINE | ID: mdl-22380264

ABSTRACT

The megavolt ITER injector concept advancement neutral injector test facility will be constituted by a RF-driven negative ion source and by an electrostatic Accelerator, designed to produce a negative Ion with a specific energy up to 1 MeV. The beam is then neutralized in order to obtain a focused 17 MW neutral beam. The magnetic configuration inside the accelerator is of crucial importance for the achievement of a good beam efficiency, with the early deflection of the co-extracted and stripped electrons, and also of the required beam optic quality, with the correction of undesired ion beamlet deflections. Several alternative magnetic design concepts have been considered, comparing in detail the magnetic and beam optics simulation results, evidencing the advantages and drawbacks of each solution both from the physics and engineering point of view.

10.
Rev Sci Instrum ; 79(10): 10F332, 2008 Oct.
Article in English | MEDLINE | ID: mdl-19044640

ABSTRACT

In magnetic-confinement toroidal machines, only a limited number of first wall modules can be equipped with current sensors, giving partial information about the distribution of the "halo" current (HC) injected into the vessel when the plasma hits the wall during disruptions. The knowledge of the complete distribution of the HC is necessary for evaluating the J x B loads exerted on the vessel structure. Since the pattern of contact areas of plasma with the wall during disruptions is spatially discontinuous, the HCs injected in the first wall (FW) cannot be efficiently fitted using harmonic functions. A procedure has been developed and implemented for estimating all the currents injected in vessel on the basis of a limited number of current sensors on the FW modules. The results obtained in the case of a numerical machine model with simplified geometry indicate that the procedure can be successfully applied to machines with more complex HC distribution, such as ITER.

SELECTION OF CITATIONS
SEARCH DETAIL