Your browser doesn't support javascript.
loading
Show: 20 | 50 | 100
Results 1 - 4 de 4
Filter
1.
Gesundheitswesen ; 85(5): 471-478, 2023 May.
Article in German | MEDLINE | ID: mdl-35073592

ABSTRACT

INTRODUCTION: Following upon our publication "Maturity Levels of Quality and Risk Management at the University Hospital Schleswig-Holstein" in 2018, we present the further development of the maturity model. Quality and risk management in hospitals is not only required by law but also plays a significant role in an optimized patient- and process-oriented health care. METHODS: A questionnaire-based self-assessment was carried out by 46 clinical units of the UKSH (location Kiel and Lübeck) for the analysis of nine quality criteria overall. Four of these criteria (quality assurance (QS), critical incident reporting system (CIRS), complaint management (BM) and process management (PM)) were already analysed in 2016 and were extended to the five new aspects, namely audits and on-site inspections, responsibilities, morbidity and mortality conferences, hygiene training and surgical safety checklist. Every quality item was graded into four categories from "A" (fully implemented) to "D" (not implemented at all). RESULTS: The comparison of the results for quality criteria QS, CIRS, BM, PM and the overall maturity level between 2016 and 2020 demonstrated statistically significant improvements in 2020 concerning the criteria QS (p=0.013), CIRS (p=0.026), PM (p=0.000) and the overall maturity levels (p=0.019). The criteria BM did not show any statistically significant improvement. The five newly added quality criteria demonstrated maturity levels "A" (fully implemented) and "B" (largely implemented) the following: audits and on-site inspections (100%), responsibilities (95.6%), morbidity and mortality conferences (65.2%), hygiene training (95.6%), and surgical safety checklist (100%). CONCLUSION: An integrated quality and risk management has already been a firm element of UKSH for years. Nevertheless, review of effectiveness of the initiated targeted measures is still a challenge. This is the reason why it is necessary to develop effective and resource-saving approaches for the evaluation of measures and the identification of potential for improvement. The recognised potential for improvement should be risk-prioritized and completely exploited using sustainable measures. Following this principle, we designed a qualitative model of maturity levels for the evaluation of our quality and risk management system at the UKSH in 2016, whose further development we demonstrate here.


Subject(s)
Delivery of Health Care , Risk Management , Humans , Hospitals, University , Germany , Surveys and Questionnaires
2.
Gesundheitswesen ; 80(7): 648-655, 2018 Jul.
Article in German | MEDLINE | ID: mdl-29768646

ABSTRACT

INTRODUCTION: Quality and risk management in hospitals are not only required by law but also for an optimal patient-centered and process-optimized patient care. To evaluate the maturity levels of quality and risk management at the University Hospital Schleswig-Holstein (UKSH), a structured analytical tool was developed for easy and efficient application. METHODS: Four criteria concerning quality management - quality assurance (QS), critical incident reporting system (CIRS), complaint management (BM) and process management (PM) - were evaluated with a structured questionnaire. Self-assessment and external assessment were performed to classify the maturity levels at the UKSH (location Kiel and Lübeck). Every quality item was graded into four categories from "A" (fully implemented) to "D" (not implemented at all). First of all, an external assessment was initiated by the head of the department of quality and risk management. Thereafter, a self-assessment was performed by 46 clinical units of the UKSH. Discrepancies were resolved in a collegial dialogue. Based on these data, overall maturity levels were obtained for every clinical unit. RESULTS: The overall maturity level "A" was reached by three out of 46 (6.5%) clinical units. No unit was graded with maturity level "D". 50% out of all units reached level "B" and 43.5% level "C". The distribution of the four different quality criteria revealed a good implementation of complaint management (maturity levels "A" and "B" in 78.3%), whereas the levels for CIRS were "C" and "D" in 73.9%. Quality assurance and process management showed quite similar distributions for the levels of maturity "B" and "C" (87% QS; 91% PM). DISCUSSION: The structured analytical tool revealed maturity levels of 46 clinical units of the UKSH and defined the maturity levels of four relevant quality criteria (QS, CIRS, BM, PM). As a consequence, extensive procedures were implemented to raise the standard of quality and risk management. In future, maturity levels will be reevaluated every two years. This qualitative maturity level model enables in a simple and efficient way precise statements concerning presence, manifestation and development of quality and risk management.


Subject(s)
Hospitals, University , Quality Assurance, Health Care , Risk Management , Delivery of Health Care , Germany , Humans
3.
Int J Health Care Qual Assur ; 23(3): 268-76, 2010.
Article in English | MEDLINE | ID: mdl-20535899

ABSTRACT

PURPOSE: Against statutory duties to introduce quality management systems, the increased importance of this subject has led to numerous activities in various public health institutions. Following the International Standardization Organization (ISO 9001:2000) prerequisites, Frankfurt Goethe University Hospital ENT clinic staff introduced a quality management system. This paper aims to investigate this process. DESIGN/METHODOLOGY/APPROACH: Designing, planning and implementing the quality management system is described. Under the supervision of an executive quality management board, clinic quality goals were defined. Thereafter, several quality management teams performed an actual state analysis as well as developing and realising improvement proposals. Finally a quality management manual containing binding standards and working instructions concerning all patient care, research and teaching aspects was written. FINDINGS: Successful certification by a neutral body ascertained that the clinic's quality management system conformed to current national and international standards while restructuring and reform improved procedural efficiency. ORIGINALITY/VALUE: The paper shows that mplementing the quality management system requires considerable effort but patients as well as staff profit considerably from the innovation. On the whole, the positive impact on structure and workflow in a specialist clinic predominates. Therefore, implementing a quality management system in all the clinic's wards and departments is recommended.


Subject(s)
Hospitals, University/organization & administration , Internationality , Otorhinolaryngologic Diseases , Outpatient Clinics, Hospital/organization & administration , Quality Assurance, Health Care/standards , Hospitals, University/standards , Humans , Outpatient Clinics, Hospital/standards , Program Evaluation , Quality Assurance, Health Care/organization & administration , Quality Indicators, Health Care
4.
BMC Health Serv Res ; 9: 21, 2009 Jan 31.
Article in English | MEDLINE | ID: mdl-19183496

ABSTRACT

BACKGROUND: Public health systems are confronted with constantly rising costs. Furthermore, diagnostic as well as treatment services become more and more specialized. These are the reasons for an interdisciplinary project on the one hand aiming at simplification of planning and scheduling patient appointments, on the other hand at fulfilling all requirements of efficiency and treatment quality. METHODS: As to understanding procedure and problem solving activities, the responsible project group strictly proceeded with four methodical steps: actual state analysis, analysis of causes, correcting measures, and examination of effectiveness. Various methods of quality management, as for instance opinion polls, data collections, and several procedures of problem identification as well as of solution proposals were applied. All activities were realized according to the requirements of the clinic's ISO 9001:2000 certified quality management system. The development of this project is described step by step from planning phase to inauguration into the daily routine of the clinic and subsequent control of effectiveness. RESULTS: Five significant problem fields could be identified. After an analysis of causes the major remedial measures were: installation of a patient telephone hotline, standardization of appointment arrangements for all patients, modification of the appointments book considering the reason for coming in planning defined working periods for certain symptoms and treatments, improvement of telephonic counselling, and transition to flexible time planning by daily updates of the appointments book. After implementation of these changes into the clinic's routine success could be demonstrated by significantly reduced waiting times and resulting increased patient satisfaction. CONCLUSION: Systematic scrutiny of the existing organizational structures of the outpatients' department of our clinic by means of actual state analysis and analysis of causes revealed the necessity of improvement. According to rules of quality management correcting measures and subsequent examination of effectiveness were performed. These changes resulted in higher satisfaction of patients, referring colleagues and clinic staff the like. Additionally the clinic is able to cope with an increasing demand for appointments in outpatients' departments, and the clinic's human resources are employed more effectively.


Subject(s)
Ambulatory Care , Appointments and Schedules , Efficiency, Organizational , Health Services Accessibility/organization & administration , Otorhinolaryngologic Diseases , Quality Control , Waiting Lists , Germany , Health Services Accessibility/standards , Humans , Interviews as Topic , Otorhinolaryngologic Diseases/therapy , Patient Satisfaction , Surveys and Questionnaires , Time Factors , Universities
SELECTION OF CITATIONS
SEARCH DETAIL
...