1.
Sci Rep ; 13(1): 10217, 2023 Jun 23.
Article in English | MEDLINE | ID: mdl-37353520

ABSTRACT

Poor payment practices are perceived as one of the biggest challenges facing the construction industry. Since payments are issued according to project contract terms, the project's cash flow is inherently affected by the contract and how parties fulfill their obligations. This research proposes a framework for payment automation in construction projects to achieve smart construction contracts. Payments are automatically issued upon satisfying contract conditions using blockchain. Cryptocurrency is proposed to be utilized in the framework to execute the contract terms with no need for a third party to process project payments. 5D BIM is used to model the geometry of buildings and visualize project progress together with payment status using Autodesk Revit, Navisworks, and Primavera P6. The developed framework has the potential to reduce the consequences of poor payments. An actual case study for a construction project in Cairo, Egypt is worked out to demonstrate the main features of the proposed framework. The results of the case study reveal that project cash flow is secured and payments are instantly issued. Moreover, electronic records of payments are kept on the blockchain.


Subject(s)
Blockchain , Construction Industry , Automation , Egypt
2.
Sci Rep ; 13(1): 2065, 2023 Feb 04.
Article in English | MEDLINE | ID: mdl-36739445

ABSTRACT

Obelisks presented an important element in the architecture of ancient Egypt. This research is concerned with the re-erection of an obelisk that belongs to the famous Pharoah Ramses II. It was found broken and was transported to the Grand Egyptian Museum for restoration and display. An observation of Ramses II Cartouche at the bottom side of the obelisk base inspired the authorities to provide an innovative architectural design to display the obelisk elevated. The supporting structure was designed to allow the visitors to walk underneath the obelisk and observe Ramses II's signature. The idea of elevating the obelisk presented several challenges including evaluating the obelisk's current condition, restoration and fixation methodology, structural stability, and uncertainties of material characteristics, amongst others. To control the obelisk deformations under lateral loading, state-of-the-art base isolators were introduced. For the task to be achieved, a multidisciplinary team including historians, conservators, archaeologists, architects, and engineers with different specialties was appointed. The team performed the task successfully and currently, the obelisk stands at the entrance piazza of the Grand Egyptian Museum representing the world's first elevated obelisk.

3.
J Adv Res ; 5(1): 49-55, 2014 Jan.
Article in English | MEDLINE | ID: mdl-25685471

ABSTRACT

Construction delays are common problems in civil engineering projects in Egypt. These problems occur frequently during project life-time leading to disputes and litigation. Therefore, it is essential to study and analyze causes of construction delays. This research presents a list of construction delay causes retrieved from literature. The feedback of construction experts was obtained through interviews. Subsequently, a questionnaire survey was prepared. The questionnaire survey was distributed to thirty-three construction experts who represent owners, consultants, and contractor's organizations. Frequency Index, Severity Index, and Importance Index are calculated and according to the highest values of them the top ten delay causes of construction projects in Egypt are determined. A case study is analyzed and compared to the most important delay causes in the research. Statistical analysis is carried out using analysis of variance ANOVA method to test delay causes, obtained from the survey. The test results reveal good correlation between groups while there is significant difference between them for some delay causes and finally roadmap for prioritizing delay causes groups is presented.

SELECTION OF CITATIONS