Your browser doesn't support javascript.
loading
Show: 20 | 50 | 100
Results 1 - 3 de 3
Filter
Add more filters











Database
Language
Publication year range
1.
Article in English | MEDLINE | ID: mdl-36767380

ABSTRACT

The environmental properties of three geotechnical composites made by recycling wastes were investigated on a laboratory scale and in the field with the use of lysimeters designated for the revitalization of degraded mining sites. Composites were prepared by combining the mine waste with paper-mill sludge and foundry sand (Composite 1), with digestate from municipal waste and paper ash (Composite 2), and with coal ash, foundry slag and waste incineration bottom ash (Composite 3). The results of laboratory leaching tests proved that Composites 1 and 3 are environmentally acceptable, according to the legislative limits, as the potentially hazardous substances were immobilized, while in Composite 2, the legislative limits were exceeded. In the field lysimeters, the lowest rate of leaching was determined for optimally compacted Composites 1 and 3, while for Composite 2 the leaching of Cu was high. This study proved that optimally installed Composites 1 and 3 are environmentally acceptable for use in construction as an alternative to virgin materials, for the revitalization of degraded mining sites or, along with Composite 2, for closure operations with landfills. In this way, locally available waste streams are valorised and channelized into a beneficial and sustainable recycling practice.


Subject(s)
Coal Ash , Incineration , Sewage , Waste Disposal Facilities , Recycling/methods , Solid Waste/analysis
2.
Toxics ; 10(1)2022 Jan 01.
Article in English | MEDLINE | ID: mdl-35051052

ABSTRACT

Old metallurgical dumps across Europe represent a loss of valuable land and a potential threat to the environment, especially to groundwater (GW). The Javornik electric arc furnace (EAF) and ladle slag heap, situated in Slovenia, was investigated in this study. The environmental impact of the slag heap was evaluated by combining leaching characterization tests of landfill samples and geochemical modelling. It was shown that throughout the landfill the same minerals and sorptive phases control the leaching of elements of potential concern, despite variations in chemical composition. Although carbonation of the disposed steel slags occurred (molar ratio CO3/(Ca+Mg) = 0.53) relative to fresh slag, it had a limited effect on the leaching behaviour of elements of potential concern. The leaching from the slag heaps had also a limited effect on the quality of the GW. A site-specific case, however, was that leachates from the slag heap were strongly diluted, since a rapid flow of GW fed from the nearby Sava River was observed in the landfill area. The sampling and testing approach applied provides a basis for assessing the long-term impact of release and is a good starting point for evaluating future management options, including beneficial uses for this type of slag.

3.
Sci Rep ; 11(1): 22363, 2021 Nov 16.
Article in English | MEDLINE | ID: mdl-34785758

ABSTRACT

This study introduces a novel geotechnical composite material comprising two types of fill material sourced from the paper industry-deinking paper sludge ash (DPSA) and deinking paper sludge (DPS). Five composites with different DPSA and DPS contents were investigated. Two composites were selected for further analyses. The technology and procedure for composite installation were implemented in field tests. The composites with 80% and 70% DPSA exhibited the elasticity required to withstand minor landslide slip deformations, in addition to achieving sufficiently high values of uniaxial compressive strength. The composites had a low maximum dry density value, which led to fewer settlements in the entire support structure. The enhanced shear characteristics can enable the construction of a thinner retaining wall. The delay between preparation and installation of the composites was further investigated. The field tests confirmed that the composites with 80% and 70% DPSA can be installed on the construction site 4 h and even 24 h after mixing. In 2018, a retaining wall structure with 70% DPSA and 30% DPS was successfully implemented near a railway line using conventional technology as followed-up research to the herein presented study. Results have been derived from work performed in the scope of the H2020 Paperchain project in which novel circular economy models centered on the valorization of the waste streams generated by the pulp and paper industry as secondary raw material for several resource-intensive sectors, including the construction sector, have been developed. Environmental benefits are savings in natural raw materials, reduction of landfill disposal as well as CO2 emission reduction.

SELECTION OF CITATIONS
SEARCH DETAIL