Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 1 de 1
Filtrar
Más filtros











Base de datos
Intervalo de año de publicación
1.
PLoS One ; 13(8): e0200753, 2018.
Artículo en Inglés | MEDLINE | ID: mdl-30067816

RESUMEN

In a collaborative product design project, reasonable resource allocation can shorten the development cycle and reduce cost. Team capacity evaluation and a task-team scheduling model are presented. A collaborative team capacity model is constructed, and a 2-tuple linguistic method is used to evaluate the capacity of collaborative teams. Next, the matching degree between design task and collaborative team is defined. A collaborative product design scheduling model considering task-team matching is developed. Combined with the simulated annealing operator, based on the single-coding strategy, self-adaptive multi-point cross and mutation, an improved genetic algorithm is proposed to solve the model. Finally, a case study is presented to validate the method.


Asunto(s)
Conducta Cooperativa , Modelos Teóricos , Algoritmos , Humanos
SELECCIÓN DE REFERENCIAS
DETALLE DE LA BÚSQUEDA