Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 2 de 2
Filtrar
Más filtros










Base de datos
Intervalo de año de publicación
1.
Int J Qual Health Care ; 35(4)2023 Oct 10.
Artículo en Inglés | MEDLINE | ID: mdl-37750687

RESUMEN

In the last 6 years, hospitals in developed countries have been trialling the use of command centres for improving organizational efficiency and patient care. However, the impact of these command centres has not been systematically studied in the past. It is a retrospective population-based study. Participants were patients who visited the Bradford Royal Infirmary hospital, Accident and Emergency (A&E) Department, between 1 January 2018 and 31 August 2021. Outcomes were patient flow (measured as A&E waiting time, length of stay, and clinician seen time) and data quality (measured by the proportion of missing treatment and assessment dates and valid transition between A&E care stages). Interrupted time-series segmented regression and process mining were used for analysis. A&E transition time from patient arrival to assessment by a clinician marginally improved during the intervention period; there was a decrease of 0.9 min [95% confidence interval (CI): 0.35-1.4], 3 min (95% CI: 2.4-3.5), 9.7 min (95% CI: 8.4-11.0), and 3.1 min (95% CI: 2.7-3.5) during 'patient flow program', 'command centre display roll-in', 'command centre activation', and 'hospital wide training program', respectively. However, the transition time from patient treatment until the conclusion of consultation showed an increase of 11.5 min (95% CI: 9.2-13.9), 12.3 min (95% CI: 8.7-15.9), 53.4 min (95% CI: 48.1-58.7), and 50.2 min (95% CI: 47.5-52.9) for the respective four post-intervention periods. Furthermore, the length of stay was not significantly impacted; the change was -8.8 h (95% CI: -17.6 to 0.08), -8.9 h (95% CI: -18.6 to 0.65), -1.67 h (95% CI: -10.3 to 6.9), and -0.54 h (95% CI: -13.9 to 12.8) during the four respective post-intervention periods. It was a similar pattern for the waiting and clinician seen times. Data quality as measured by the proportion of missing dates of records was generally poor (treatment date = 42.7% and clinician seen date = 23.4%) and did not significantly improve during the intervention periods. The findings of the study suggest that a command centre package that includes process change and software technology does not appear to have a consistent positive impact on patient safety and data quality based on the indicators and data we used. Therefore, hospitals considering introducing a command centre should not assume there will be benefits in patient flow and data quality.


Asunto(s)
Hospitales , Medicina Estatal , Humanos , Estudios Retrospectivos , Derivación y Consulta , Reino Unido , Servicio de Urgencia en Hospital , Tiempo de Internación
2.
BMJ Health Care Inform ; 30(1)2023 Jan.
Artículo en Inglés | MEDLINE | ID: mdl-36697032

RESUMEN

BACKGROUND: Command centres have been piloted in some hospitals across the developed world in the last few years. Their impact on patient safety, however, has not been systematically studied. Hence, we aimed to investigate this. METHODS: This is a retrospective population-based cohort study. Participants were patients who visited Bradford Royal Infirmary Hospital and Calderdale & Huddersfield hospitals between 1 January 2018 and 31 August 2021. A five-phase, interrupted time series, linear regression analysis was used. RESULTS: After introduction of a Command Centre, while mortality and readmissions marginally improved, there was no statistically significant impact on postoperative sepsis. In the intervention hospital, when compared with the preintervention period, mortality decreased by 1.4% (95% CI 0.8% to 1.9%), 1.5% (95% CI 0.9% to 2.1%), 1.3% (95% CI 0.7% to 1.8%) and 2.5% (95% CI 1.7% to 3.4%) during successive phases of the command centre programme, including roll-in and activation of the technology and preparatory quality improvement work. However, in the control site, compared with the baseline, the weekly mortality also decreased by 2.0% (95% CI 0.9 to 3.1), 2.3% (95% CI 1.1 to 3.5), 1.3% (95% CI 0.2 to 2.4), 3.1% (95% CI 1.4 to 4.8) for the respective intervention phases. No impact on any of the indicators was observed when only the software technology part of the Command Centre was considered. CONCLUSION: Implementation of a hospital Command Centre may have a marginal positive impact on patient safety when implemented as part of a broader hospital-wide improvement programme including colocation of operations and clinical leads in a central location. However, improvement in patient safety indicators was also observed for a comparable period in the control site. Further evaluative research into the impact of hospital command centres on a broader range of patient safety and other outcomes is warranted.


Asunto(s)
Hospitales , Pacientes , Humanos , Análisis de Series de Tiempo Interrumpido , Estudios Retrospectivos , Estudios de Cohortes
SELECCIÓN DE REFERENCIAS
DETALLE DE LA BÚSQUEDA
...