Coupling simulation of pipeline nodes - Storage tank linkage in urban high-density built-up areas using optimization model.
Zhang, Yangxuan; Jiang, Chunbo; Han, Qiaohui; Zhang, Xiang; Li, Jiake; Xiao, Yi.
Afiliación
  • Zhang Y; State Key Laboratory of Eco-hydraulics in Northwest Arid Region of China, Xi'an University of Technology, Xi'an 710048, China.
  • Jiang C; State Key Laboratory of Eco-hydraulics in Northwest Arid Region of China, Xi'an University of Technology, Xi'an 710048, China. Electronic address: chunbo@xaut.edu.cn.
  • Han Q; State Key Laboratory of Eco-hydraulics in Northwest Arid Region of China, Xi'an University of Technology, Xi'an 710048, China.
  • Zhang X; Hubei Key Laboratory of Water System Science for Sponge City Construction, Wuhan University, Wuhan 430072, China.
  • Li J; State Key Laboratory of Eco-hydraulics in Northwest Arid Region of China, Xi'an University of Technology, Xi'an 710048, China.
  • Xiao Y; Hubei Key Laboratory of Water System Science for Sponge City Construction, Wuhan University, Wuhan 430072, China.
J Environ Manage ; 357: 120850, 2024 Apr.
Article en En | MEDLINE | ID: mdl-38583384
ABSTRACT
Climate change and urbanization contribute to the increased frequency of short-duration intense rainstorms. Traditional solutions often involve multiple scenarios for cost-effectiveness comparison, neglecting the rationality of placement conditions. The effective coupling and coordination of the location, number, size, and cost of storage tanks are crucial to addressing this issue. A three-phase approach is proposed to enhance the dynamic link between drainage pipeline and storage tanks in urban high-density built-up areas, integrating Python language, SWMM, the Elitist Non-Dominated Sorting Genetic Algorithm (NSGA-III), and the Analytic Hierarchy Process (AHP) methods. In the first stage, each node within the pipeline network is considered as a potential storage tank location. In the second stage, factors such as the length and diameter of the upstream connecting pipeline, as well as the suitability of the storage tank location, are assessed. In the third stage, the length and diameter of the downstream connecting pipeline node are evaluated. The results show that the 90 overflow nodes (overflow time >0.5h) have been cleared using the three-phase approach with a 50a (duration = 3h) return period as the rainfall scenario, which meets the flooding limitations. After the completion of the three-phase method configuration, the total overflow and SS loads were reduced by 96.45% and 49.30%, respectively, compared to the status quo conditions. These two indicators have decreased by 48.16 and 9.05%, respectively, compared to the first phase (the traditional method of only replacing all overflow nodes with storage tanks). The proposed framework enables decision-makers to evaluate the acceptability and reliability of the optimal management plan, taking into account their preferences and uncertainties.
Asunto(s)
Palabras clave

Texto completo: 1 Colección: 01-internacional Base de datos: MEDLINE Asunto principal: Lluvia / Inundaciones Idioma: En Revista: J Environ Manage Año: 2024 Tipo del documento: Article País de afiliación: China

Texto completo: 1 Colección: 01-internacional Base de datos: MEDLINE Asunto principal: Lluvia / Inundaciones Idioma: En Revista: J Environ Manage Año: 2024 Tipo del documento: Article País de afiliación: China