Your browser doesn't support javascript.
loading
Impact of lean six sigma process improvement methodology on cardiac catheterization laboratory efficiency.
Agarwal, Shikhar; Gallo, Justin J; Parashar, Akhil; Agarwal, Kanika K; Ellis, Stephen G; Khot, Umesh N; Spooner, Robin; Murat Tuzcu, Emin; Kapadia, Samir R.
Afiliação
  • Agarwal S; Sones Cardiac Catheterization Laboratories, Department of Cardiovascular Medicine, J2-3, Heart and Vascular Institute, Cleveland Clinic, 9500 Euclid Avenue, Cleveland, OH 44195.
  • Gallo JJ; Sones Cardiac Catheterization Laboratories, Department of Cardiovascular Medicine, J2-3, Heart and Vascular Institute, Cleveland Clinic, 9500 Euclid Avenue, Cleveland, OH 44195.
  • Parashar A; Sones Cardiac Catheterization Laboratories, Department of Cardiovascular Medicine, J2-3, Heart and Vascular Institute, Cleveland Clinic, 9500 Euclid Avenue, Cleveland, OH 44195.
  • Agarwal KK; Sones Cardiac Catheterization Laboratories, Department of Cardiovascular Medicine, J2-3, Heart and Vascular Institute, Cleveland Clinic, 9500 Euclid Avenue, Cleveland, OH 44195.
  • Ellis SG; Sones Cardiac Catheterization Laboratories, Department of Cardiovascular Medicine, J2-3, Heart and Vascular Institute, Cleveland Clinic, 9500 Euclid Avenue, Cleveland, OH 44195.
  • Khot UN; Sones Cardiac Catheterization Laboratories, Department of Cardiovascular Medicine, J2-3, Heart and Vascular Institute, Cleveland Clinic, 9500 Euclid Avenue, Cleveland, OH 44195.
  • Spooner R; Sones Cardiac Catheterization Laboratories, Department of Cardiovascular Medicine, J2-3, Heart and Vascular Institute, Cleveland Clinic, 9500 Euclid Avenue, Cleveland, OH 44195.
  • Murat Tuzcu E; Sones Cardiac Catheterization Laboratories, Department of Cardiovascular Medicine, J2-3, Heart and Vascular Institute, Cleveland Clinic, 9500 Euclid Avenue, Cleveland, OH 44195.
  • Kapadia SR; Sones Cardiac Catheterization Laboratories, Department of Cardiovascular Medicine, J2-3, Heart and Vascular Institute, Cleveland Clinic, 9500 Euclid Avenue, Cleveland, OH 44195. Electronic address: kapadis@ccf.org.
Cardiovasc Revasc Med ; 17(2): 95-101, 2016 Mar.
Article em En | MEDLINE | ID: mdl-26905051
ABSTRACT

BACKGROUND:

Operational inefficiencies are ubiquitous in several healthcare processes. To improve the operational efficiency of our catheterization laboratory (Cath Lab), we implemented a lean six sigma process improvement initiative, starting in June 2010. We aimed to study the impact of lean six sigma implementation on improving the efficiency and the patient throughput in our Cath Lab.

METHODS:

All elective and urgent cardiac catheterization procedures including diagnostic coronary angiography, percutaneous coronary interventions, structural interventions and peripheral interventions performed between June 2009 and December 2012 were included in the study. Performance metrics utilized for analysis included turn-time, physician downtime, on-time patient arrival, on-time physician arrival, on-time start and manual sheath-pulls inside the Cath Lab.

RESULTS:

After implementation of lean six sigma in the Cath Lab, we observed a significant improvement in turn-time, physician downtime, on-time patient arrival, on-time physician arrival, on-time start as well as sheath-pulls inside the Cath Lab. The percentage of cases with optimal turn-time increased from 43.6% in 2009 to 56.6% in 2012 (p-trend<0.001). Similarly, the percentage of cases with an aggregate on-time start increased from 41.7% in 2009 to 62.8% in 2012 (p-trend<0.001). In addition, the percentage of manual sheath-pulls performed in the Cath Lab decreased from 60.7% in 2009 to 22.7% in 2012 (p-trend<0.001).

CONCLUSIONS:

The current longitudinal study illustrates the impact of successful implementation of a well-known process improvement initiative, lean six sigma, on improving and sustaining efficiency of our Cath Lab operation. After the successful implementation of this continuous quality improvement initiative, there was a significant improvement in the selected performance metrics namely turn-time, physician downtime, on-time patient arrival, on-time physician arrival, on-time start as well as sheath-pulls inside the Cath Lab.
Assuntos
Palavras-chave

Texto completo: 1 Base de dados: MEDLINE Assunto principal: Cateterismo Periférico / Cateterismo Cardíaco / Avaliação de Processos em Cuidados de Saúde / Gestão da Qualidade Total / Eficiência Organizacional / Indicadores de Qualidade em Assistência à Saúde / Atenção à Saúde / Procedimentos Endovasculares / Melhoria de Qualidade Tipo de estudo: Evaluation_studies / Guideline / Observational_studies / Prognostic_studies Limite: Humans Idioma: En Ano de publicação: 2016 Tipo de documento: Article

Texto completo: 1 Base de dados: MEDLINE Assunto principal: Cateterismo Periférico / Cateterismo Cardíaco / Avaliação de Processos em Cuidados de Saúde / Gestão da Qualidade Total / Eficiência Organizacional / Indicadores de Qualidade em Assistência à Saúde / Atenção à Saúde / Procedimentos Endovasculares / Melhoria de Qualidade Tipo de estudo: Evaluation_studies / Guideline / Observational_studies / Prognostic_studies Limite: Humans Idioma: En Ano de publicação: 2016 Tipo de documento: Article