Your browser doesn't support javascript.
loading
Long-term performance of nutrient removal in an integrated constructed wetland.
Zhu, Yinuo; Cui, Lijuan; Li, Jing; Wang, Rumiao; Vymazal, Jan; Li, Wei; Lei, Yinru; Zhang, Manyin; Hao, Ting; Wei, Jiaming.
Afiliação
  • Zhu Y; Institute of Wetland Research, Chinese Academy of Forestry, Beijing 100091, China; Beijing Key Laboratory of Wetland Ecological Function and Restoration, Beijing 100091, China; Beijing Hanshiqiao National Wetland Ecosystem Research Station, Beijing 101399, China.
  • Cui L; Institute of Wetland Research, Chinese Academy of Forestry, Beijing 100091, China; Beijing Key Laboratory of Wetland Ecological Function and Restoration, Beijing 100091, China; Beijing Hanshiqiao National Wetland Ecosystem Research Station, Beijing 101399, China. Electronic address: wetlands108@126.
  • Li J; Institute of Wetland Research, Chinese Academy of Forestry, Beijing 100091, China; Beijing Key Laboratory of Wetland Ecological Function and Restoration, Beijing 100091, China; Beijing Hanshiqiao National Wetland Ecosystem Research Station, Beijing 101399, China.
  • Wang R; Institute of Wetland Research, Chinese Academy of Forestry, Beijing 100091, China; Beijing Key Laboratory of Wetland Ecological Function and Restoration, Beijing 100091, China; Beijing Hanshiqiao National Wetland Ecosystem Research Station, Beijing 101399, China.
  • Vymazal J; Czech University of Life Sciences Prague, Faculty of Environmental Sciences, Kamýcká 129, 165 21 Praha 6, Czech Republic.
  • Li W; Institute of Wetland Research, Chinese Academy of Forestry, Beijing 100091, China; Beijing Key Laboratory of Wetland Ecological Function and Restoration, Beijing 100091, China; Beijing Hanshiqiao National Wetland Ecosystem Research Station, Beijing 101399, China.
  • Lei Y; Institute of Wetland Research, Chinese Academy of Forestry, Beijing 100091, China; Beijing Key Laboratory of Wetland Ecological Function and Restoration, Beijing 100091, China; Beijing Hanshiqiao National Wetland Ecosystem Research Station, Beijing 101399, China.
  • Zhang M; Institute of Wetland Research, Chinese Academy of Forestry, Beijing 100091, China; Beijing Key Laboratory of Wetland Ecological Function and Restoration, Beijing 100091, China; Beijing Hanshiqiao National Wetland Ecosystem Research Station, Beijing 101399, China.
  • Hao T; Institute of Wetland Research, Chinese Academy of Forestry, Beijing 100091, China; Beijing Key Laboratory of Wetland Ecological Function and Restoration, Beijing 100091, China; Beijing Hanshiqiao National Wetland Ecosystem Research Station, Beijing 101399, China.
  • Wei J; Beijing Construction Engineering Group Environmental Remediation Co. Ltd, National Engineering Laboratory for Site Remediation Technologies, Beijing 100015, China.
Sci Total Environ ; 779: 146268, 2021 Jul 20.
Article em En | MEDLINE | ID: mdl-33744583
ABSTRACT
Constructed wetlands (CWs) have been regarded as efficient technologies for both wastewater treatment and reuse of water resources. Most studies on CW treatment efficiency are limited to a short-term perspective, and there are still many unknowns about the long-term performance of CWs. Here we evaluated the performance of an integrated CW that has been in operation for more than ten years. The average removal rates of TN and TP were maintained at 53.6% and 67.3% over 10 years, respectively. The annual mass reductions in TN and TP reached 937.5 kg ha-1 yr-1 and 303.2 kg ha-1 yr-1, respectively. In addition, TN removal rate was significantly higher in summer and autumn than those in spring, yet there was no seasonal difference in TP removal. The bacterial richness and diversity in summer and autumn were higher than those in spring. TN and TOC not only determine the bacterial community structure, but also affect the removal efficiency of CW. Denitrification and dephosphorization microorganisms were enriched and accounted for a considerable proportion (21.14-52.85%) in the bacterial community. In addition, the relative abundance of Pseudomonas was significantly positively related with the rate of TN and TP removal.
Palavras-chave

Texto completo: 1 Base de dados: MEDLINE Idioma: En Ano de publicação: 2021 Tipo de documento: Article

Texto completo: 1 Base de dados: MEDLINE Idioma: En Ano de publicação: 2021 Tipo de documento: Article