Your browser doesn't support javascript.
loading
Enumeration optimization of open pit production scheduling based on mobile capacity search domain.
Xu, Xiaochuan; Gu, Xiaowei; Wang, Qing; Zhao, Yunqi; Kong, Wenyuan; Zhu, Zhenguo; Wang, Fengdan.
Afiliação
  • Xu X; College of Resources and Civil Engineering, Northeastern University, Shenyang, China. xuxiaochuan@mail.neu.edu.cn.
  • Gu X; Science and Technology Innovation Center of Smart Water and Resource Environment, Northeastern University, Shenyang, 110819, China. xuxiaochuan@mail.neu.edu.cn.
  • Wang Q; College of Resources and Civil Engineering, Northeastern University, Shenyang, China.
  • Zhao Y; Science and Technology Innovation Center of Smart Water and Resource Environment, Northeastern University, Shenyang, 110819, China.
  • Kong W; College of Resources and Civil Engineering, Northeastern University, Shenyang, China.
  • Zhu Z; Science and Technology Innovation Center of Smart Water and Resource Environment, Northeastern University, Shenyang, 110819, China.
  • Wang F; College of Resources and Civil Engineering, Northeastern University, Shenyang, China.
Sci Rep ; 13(1): 91, 2023 01 03.
Article em En | MEDLINE | ID: mdl-36596854
ABSTRACT
The optimization of open pit mine production scheduling is not only a multistage decision-making problem but also involves space-time dynamic action among multiple factors, which makes it difficult to optimize production capacity, mining sequence, mining life, and other factors simultaneously in optimizing design. In addition, the production capacity is disorderly expanded, the calculation scale is large, and the optimization time is long. Therefore, this article designs a mobile capacity search domain method to improve computing efficiency without omitting the optimal production capacity. At the same time, taking the maximum net present value as the objective function, an enumeration method is used to optimize the possible paths in different capacity domains and calculate the infrastructure investment and facility idle cost required to meet the maximum production capacity on each possible path to control the disorderly expansion and violent fluctuation of production capacity. The research shows that the open pit mine production scheduling optimization algorithm proposed in this article can not only realize the simultaneous optimization of the three elements of production capacity, mining sequence, and mining life but also improve the computing efficiency by 200 times. Furthermore, the production capacity fluctuation is less than 1.4%. The mining life of the mine is extended by 13 years, and the overall economic benefit is increased by 18%.
Assuntos

Texto completo: 1 Base de dados: MEDLINE Assunto principal: Algoritmos / Mineração Tipo de estudo: Prognostic_studies Idioma: En Ano de publicação: 2023 Tipo de documento: Article

Texto completo: 1 Base de dados: MEDLINE Assunto principal: Algoritmos / Mineração Tipo de estudo: Prognostic_studies Idioma: En Ano de publicação: 2023 Tipo de documento: Article