Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 2 de 2
Filtrar
Mais filtros










Base de dados
Intervalo de ano de publicação
1.
BMJ Mil Health ; 166(5): 287-293, 2020 Oct.
Artigo em Inglês | MEDLINE | ID: mdl-32665423

RESUMO

INTRODUCTION: Future conflicts may have limited use of aviation-based prehospital emergency care for evacuation. This will increase the likelihood of extended evacuation timelines and an extended hold at a forward hospital care facility following the completion of damage control surgery or acute medical interventions. METHODS: A three-round Delphi Study was undertaken using a panel comprising 44 experts from the UK armed forces including clinicians, logisticians, medical planners and commanders. The panel was asked to consider the effect of an extended hold at Deployed Hospital Care (Forward) from the current 2-hour timeline to +4, +8, +12 and +24 hours on a broad range of clinical and logistical issues. Where 75% of respondents had the same opinion, consensus was accepted. Areas where consensus could not be achieved were used to identify future research priorities. RESULTS: Consensus was reached that increasing timelines would increase the personnel, logistics and equipment support required to provide clinical care. There is a tipping point with a prolonged hold over 8 hours, after which the greatest number of clinical concerns emerge. Additional specialties of surgeons other than general and orthopaedic surgeons will likely be required with holds over 24 hours, and robust telemedicine would not negate this requirement. CONCLUSIONS: Retaining acute medical emergencies at 4 hours, and head injuries was considered a particular risk. This could potentially be mitigated by an increased forward capacity of some elements of medical care and availability of a CT scanner and intracranial pressure monitoring at over 12 hours. Any efforts to mitigate the effects of prolonged timelines will come at the expense of an increased logistical burden and a reduction in mobility. Ultimately the true effect of prolonged timelines can only be answered by close audit and analysis of clinical outcomes during future operations with an extended hold.


Assuntos
Mortalidade/tendências , Transferência de Pacientes/normas , Fatores de Tempo , Guerra , Adulto , Idoso , Consenso , Técnica Delphi , Feminino , Humanos , Masculino , Pessoa de Meia-Idade , Morbidade/tendências , Transferência de Pacientes/métodos , Reino Unido
2.
J R Army Med Corps ; 158(1): 38-40; discussion 40, 2012 Mar.
Artigo em Inglês | MEDLINE | ID: mdl-22545372

RESUMO

UK forces deployed to Afghanistan between March and November are prescribed anti-malarial chemoprophylaxis (AMC). In 2007 an audit showed poor pre-injury AMC compliance and a prescription rate of 50% amongst those casualties evacuated to Role 4. We re-audited the post-deployment AMC prescribing practice for casualties from Afghanistan for the 2008 and half of the 2009 malaria season. Using the Role 4 prescribing information and communication system (PICS), a retrospective AMC search for Proguanil, Chloroquine, Doxycycline, Mefloquine and Malarone was performed on these casualties. Only five out of 305 (1.64%) inpatients were prescribed appropriate post-deployment AMC medication. Awareness of the need to prescribe AMC following evacuation remains poor, and may be improved by recording AMC compliance in field medical records and modifying the PICS software.


Assuntos
Antimaláricos/uso terapêutico , Prescrições de Medicamentos/estatística & dados numéricos , Malária/prevenção & controle , Militares , Campanha Afegã de 2001- , Atovaquona/uso terapêutico , Quimioprevenção , Cloroquina/uso terapêutico , Auditoria Clínica , Doxiciclina/uso terapêutico , Combinação de Medicamentos , Humanos , Mefloquina/uso terapêutico , Proguanil/uso terapêutico
SELEÇÃO DE REFERÊNCIAS
DETALHE DA PESQUISA
...