Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 1 de 1
Filtrar
Mais filtros










Base de dados
Intervalo de ano de publicação
1.
Water Sci Technol ; 88(3): 763-777, 2023 Aug.
Artigo em Inglês | MEDLINE | ID: mdl-37578888

RESUMO

Numerous anthropogenic activities like the construction of large dams, storages, and barrages changed the watershed characteristics impacting ecosystem health. In this study, the hydrological alterations (HAs) that have occurred in the Bhima River due to the construction of the Ujjani dam were analyzed. The hydraulic analysis is also performed to determine the hydraulic parameter and recommend the lowest flow release from the dam for improving ecosystem health. Fifty-eight years of data starting from the year 1960 to 2018 were gathered at Yadgir station, which is located downstream of the Ujjani dam. The data were divided into pre- and post-construction river flow discharge. To check for the change in the river flow regime for the post-dam construction period, HA was calculated using Flow Health Software (FHS). The results demonstrate that the dam impoundment reduces high flows primarily by storing flood flow for water supply, irrigation, etc. The velocity and depth provided by the environmental design flow for a flow health (FH) score of 0.62 give a very good habitat to fishes. A minimum release of 24.8 m3/s from the dam is recommended. This study will help policymakers mitigate the impacts of degrading ecosystem health of the Bhima River.

SELEÇÃO DE REFERÊNCIAS
DETALHE DA PESQUISA
...