Your browser doesn't support javascript.
loading
Enfoque basado en riesgo desde la etapa de desarrollo del producto succinilcolina infantil 100 mg / Risk-based approach from the development phase of 100mg infant succinylcoline product
Burguet Lago, Nancy; Trimiño Romero, José A; Alfonso Cortez, Leonardo; Cardoza Lobaina, Danelys; Muñoz Herrera, Juan A.
Afiliação
  • Burguet Lago, Nancy; Laboratorios LIORAD. Unidad Empresarial de Base. La Habana. CU
  • Trimiño Romero, José A; Laboratorios LIORAD. Unidad Empresarial de Base. La Habana. CU
  • Alfonso Cortez, Leonardo; Laboratorios LIORAD. Unidad Empresarial de Base. La Habana. CU
  • Cardoza Lobaina, Danelys; Laboratorios LIORAD. Unidad Empresarial de Base. La Habana. CU
  • Muñoz Herrera, Juan A; Laboratorios LIORAD. Unidad Empresarial de Base. La Habana. CU
Rev. cuba. farm ; 49(3)jul.-set. 2015. ilus, graf
Artigo em Espanhol | LILACS, CUMED | ID: lil-779721
Biblioteca responsável: CU1.1
RESUMEN

Introducción:

en la actualidad las guías emitidas por la Agencia de Medicamentos y Alimentos, de los EU considera que los procesos fallan porque las fuentes no son debidamente identificadas, eliminadas o controladas y plantean un nuevo enfoque de Buenas Prácticas de Producción basado en riesgos.

Objetivo:

aplicar un enfoque basado en riesgos en el aseguramiento de la calidad desde la etapa de desarrollo del producto succinilcolina 100 mg.

Métodos:

se realizó una breve descripción del proceso mediante un diagrama de bloque, se empleó el Árbol de Fallas como herramienta para identificar las posibles fuentes de falla; la valoración de riesgos partiendo de la identificación de las posibles fuentes de fallos se ejecutó a través de un método matricial. Se identificó un orden de prioridad en la toma de acciones correctivas para eliminar o mitigar el riesgo de ocurrencia.

Resultados:

el diagrama de bloque permitió tener un conocimiento sobre el proceso, lo que contribuyó de forma decisiva a un mejor ejercicio de la gestión de riesgos. El Árbol de Fallas resultó útil al revelar de forma gráfica las diferentes combinaciones de fallos e interrelaciones entre causa y efecto que pudieran dar lugar al evento tope indeseado. El método empleado para la valoración de riesgos permitió determinar las prioridades, siendo el tiempo extensivo de llenado (fuera de 2-8 °C) el componente crítico a considerar con especial atención; si se tiene en cuenta que la estabilidad de este producto se puede afectar a temperaturas superiores a estas, por lo que disponer de un plan de acciones correctivas acorde a los riesgos identificados permitirá la eliminación o mitigación de las mismas.

Conclusiones:

la herramienta de gestión de riesgos permitió identificar desde la etapa de desarrollo del producto succinilcolina 100 mg, las principales fuentes de fallas relacionadas con este proceso(AU)
ABSTRACT

Introduction:

the guidelines presently issued by the Food and Drug Agency of the United States considers that processes fail because the sources are not duly identified, eliminated or controlled and submit a new approach of Good Manufacture Practice based on risks.

Objective:

to apply a risk-based approach to the quality assurance from the development phase of the 100 mg succinylcoline product.

Methods:

the process was briefly described through a block diagram with Failure Tree as a tool for identification of possible sources of failures; the risk assessment based on the detection of the possible sources of failures was made with the matrix method. An order of priority was given in the implementation of corrective actions to eliminate or mitigate the risk of occurrence.

Results:

the block diagram allowed knowing the process, which contributed in a decisive way to a better application of risk management. The Failure Tree proved to be useful when showing in a graphical way the different failure combinations and interrelations between cause and effect that might give rise to the unwanted top event. The method for the risk assessment made it possible to determine priorities, being the long time of filling (not within 2 to 8oC) the critical component to be specially considered if one takes into account that stability of the product may be affected by higher temperatures, therefore, a plan of corrective actions according to the identified risks will allow their elimination or mitigation.

Conclusions:

the risk management tool allowed identifying the main process-related sources of failures from the very development phase of the 100 mg succinylcoline product.
Assuntos

Texto completo: Disponível Coleções: Bases de dados internacionais Base de dados: CUMED / LILACS Assunto principal: Gestão de Riscos / Succinilcolina / Composição de Medicamentos Tipo de estudo: Estudo de etiologia / Guia de prática clínica / Estudo prognóstico / Fatores de risco Limite: Criança / Humanos Idioma: Espanhol Revista: Rev. cuba. farm Assunto da revista: Farmácia Ano de publicação: 2015 Tipo de documento: Artigo País de afiliação: Cuba Instituição/País de afiliação: Laboratorios LIORAD/CU
Texto completo: Disponível Coleções: Bases de dados internacionais Base de dados: CUMED / LILACS Assunto principal: Gestão de Riscos / Succinilcolina / Composição de Medicamentos Tipo de estudo: Estudo de etiologia / Guia de prática clínica / Estudo prognóstico / Fatores de risco Limite: Criança / Humanos Idioma: Espanhol Revista: Rev. cuba. farm Assunto da revista: Farmácia Ano de publicação: 2015 Tipo de documento: Artigo País de afiliação: Cuba Instituição/País de afiliação: Laboratorios LIORAD/CU
...