Your browser doesn't support javascript.
loading
Optimization of production system of shale oil development in Ordos basin, China.
Wan, Xiaolong; Ma, Shuwei; Fan, Jianming; Zhang, Yuanli; Zhang, Chao.
Afiliação
  • Wan X; College of Geosciences, China University of Petroleum (Beijing), Beijing, 102249, China.
  • Ma S; PetroChina Changqing Oilfield Company, Xi'an, 710018, People's Republic of China.
  • Fan J; Research Institute of Exploration and Development, PetroChina Changqing Oilfield Company, Xi'an, 710018, People's Republic of China. shuwei.ma@hotmail.com.
  • Zhang Y; National Engineering Laboratory for Exploration and Development of Low Permeability Oil and Gas Fields, Xi'an, 710018, People's Republic of China. shuwei.ma@hotmail.com.
  • Zhang C; PetroChina Changqing Oilfield Company, Xi'an, 710018, People's Republic of China.
Sci Rep ; 13(1): 6515, 2023 Apr 21.
Article em En | MEDLINE | ID: mdl-37085546
ABSTRACT
In this paper, production system (PS) of shale oil is optimized according to production data and indoor experiments, including core and fluid tests. Results showed that ① Pressure drop rate at wellhead is a reasonable reference for the determination of post-fracture shut-in duration (PFSID). When pressure at a wellhead of horizontal well is relatively stable and the pressure drop less than 0.1 MPa per day for three consecutive days, PFSID ends; ② Flowback intensity of fracturing fluid affects the effectiveness of proppant underground, thus flowback intensity can be determined by the critical flow rate and safety factor of each proppant; ③ Flowback intensity should be varied during different development stages, which could be divided into four according to production gas and oil ratio(GOR) of a shale oil horizontal well low, medium-high, high and high-low production GOR. During the stage of low production GOR, ratio of flow pressure and saturation pressure should be maintained greater than 1.0, and the initial daily liquid productivity for a hundred-meter oil-bearing lateral length in a horizontal well is 2.4 ~ 2.9 m3/d; and during the medium-high production GOR, high production GOR and high-low production GOR stages, the responding initial daily liquid productivity should be maintained between 0.8 ~ 1.0 or less than 0.8 respectively.

Texto completo: 1 Coleções: 01-internacional Base de dados: MEDLINE Idioma: En Revista: Sci Rep Ano de publicação: 2023 Tipo de documento: Article País de afiliação: China

Texto completo: 1 Coleções: 01-internacional Base de dados: MEDLINE Idioma: En Revista: Sci Rep Ano de publicação: 2023 Tipo de documento: Article País de afiliação: China
...